McDonald's at Santa Clara <br />ASSUMPTIONS <br />• Additional out -of -scope work efforts not explicitly described above will require a budget <br />augment. <br />• Changes to the Project description, Project design, grading, or assumptions that occur afterthe <br />initiation of technical analysis/studies will result in additional costs. <br />• The following information and reports will be provided by the Applicant: <br />o Water Quality Management Plan (WQMP) <br />o Hydrology and Hydraulics Report <br />o Geotechnieal Report <br />o Traffic Analysis <br />• Additional review cycles of the IS/MND not described in this scope may require a budget <br />augment. <br />• Attendance at Project meetings and hearings are as outlined in this SOW; additional meetings <br />and/or hearings can be attended on a time and materials basis. <br />• Direct costs are based on best available information. <br />• Delays in the schedule after the Project has been initiated may require a budget augment. <br />R T,,.,-1 iry msama a�avamaoaia ismeo-W0123.m.. B-2 Cost Estimate <br />