Laserfiche WebLink
McDonald's at Santa Clara Avenue <br />ATTACHMENT C <br />SCHEDULE <br />MCDONALD'S AT SANTA CLARA AVENUE PROJECT <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />May 4, 2023, Revised June 1, 2023 <br />This SOW assumes an up to six-month schedule, upon receipt of final information for the Project <br />description. The six-month schedule for the preparation of the IS/MND does not include the approval <br />process for the IS/MND. Psomas will work diligently and coordinate closely with the City and Project <br />team to ensure the IS/MND is completed efficiently, on time, and within budget. All time -saving <br />approaches will be utilized to speed up the schedule, However, Psomas will ensure that time -saving <br />approaches will not jeopardize the quality of the document. <br />TASK <br />SCHEDULE <br />DURATION <br />Task 1 —Project Initiation <br />Kick -Off Meeting <br />Week l <br />1 Day <br />Data Collection and Site Visit <br />Week 1 <br />1 Week <br />Project Description <br />Weeks I to 2 <br />2 Weeks <br />i <br />City review of the Draft Project Description <br />Week 3 <br />f 1 Week <br />Final Project Description <br />Week 4 <br />I Week <br />Task 2 —Technical Analyses/Studies <br />Peer Review of Applicant Prepared Analyses <br />Weeks 3 to 4 <br />2 Weeks I <br />• Water Quality Management Plan (WQMP) 1 <br />• Hydrology and Hydraulics Report <br />• Geotechnical Report <br />• Traffic Analysis <br />Psomas Prepare Peer Review Memoranda <br />Weeks 3 to 4 <br />! 2 Weeks ! <br />City Review of Memoranda <br />Week 5 <br />1 Week <br />Applicant Finalize the Reports <br />Weeks 6 to 7 <br />j 2 Weeks <br />Prepare Technical Analyses <br />Weeks 3 to 5 <br />3 Weeks <br />• Air Quality and Greenhouse Gas Emissions <br />(Psomas) <br />• Energy (Psomas) <br />j <br />• Noise (Psomas) <br />� <br />• Historic Built Environment Assessment (South <br />Environmental) <br />Task 3 -Initial Study/Mitigated Negative Declaration <br />i <br />Administrative Draft IS/MND <br />Weeks 5 to 8 <br />4 Weeks <br />City and Applicant Review <br />Weeks 9 to 11 <br />3 Weeks i <br />Proofcheck Draft IS/MND <br />Weeks 12 to 14 <br />! 3 Weeks <br />aw,oposais=y of8aoff a aAMcooneiaisMrvo-ao123.eoc. C-1 Cost&timate <br />