My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:13:48 PM
Creation date
10/11/2023 3:19:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract with All American Asphalt <br />October 17, 2023 <br />Page 4 <br />The proposed contract enables staff to authorize a construction cost increase of up to <br />25 percent if necessary for contingencies. Staff expects to utilize other available Public <br />Works appropriations if a contingency becomes necessary to complete the project. If <br />there are no other available appropriations, then Staff will return to City Council with a <br />project update and recommendations. <br />The following table summarizes the funds budgeted and available in current FY 2023-24 <br />(Exhibit 5) for expenditure to deliver construction of this project. Any remaining balances <br />not expended at the end of the fiscal year will be presented to City Council for approval <br />of carryovers to FY 2024-25. <br />Fiscal <br />Accounting Unit - <br />Fund <br />Accounting Unit, <br />Year <br />Account No. <br />Description <br />Account No. <br />Amount <br />(Project No.) <br />Description <br />Existing Budget <br />2023-24 <br />05917665-66220 <br />Select Street <br />HUTA Gas Tax — <br />$972,000 <br />(21-6979) <br />Construction <br />RMRA, Improvements <br />Other Than Buildings <br />2023-24 <br />05917665-66220 <br />Select Street <br />HUTA Gas Tax — <br />$731,000 <br />(21-6980) <br />Construction <br />RMRA, Improvements <br />Other Than Buildings <br />Budget Reallocation <br />2023-24 <br />05917665-66220 <br />Select Street <br />HUTA Gas Tax — <br />(From Proj. 21- <br />Construction <br />RMRA, Improvements <br />$335,990 <br />6978 to 21-6979) <br />Other Than Buildings <br />2023-24 <br />05917665-66220 <br />Select Street <br />HUTA Gas Tax — <br />(From Proj. 21- <br />Construction <br />RMRA, Improvements <br />$335,990 <br />6978 to 21-6980) <br />Other Than Buildings <br />Total <br />$2,374,980 <br />EXHIBIT(S) <br />1. Location Map <br />2. Bid Proposal <br />3. Construction Contract <br />4. Cost Analysis <br />5. CIP Project Sheets <br />Submitted By: Nabil Saba, P.E., Executive Director — Public Works Agency <br />Approved By: Steven A. Mendoza, Assistant City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.