My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:13:48 PM
Creation date
10/11/2023 3:19:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Construction Contract with All American Asphalt <br />October 17, 2023 <br />Page 3 <br />recommends awarding the construction contract to All American Asphalt, in the amount <br />of the base bid totaling $1,899,983 (Exhibit 3). <br />All American Asphalt has worked on various projects for the City of Santa Ana <br />throughout the last several years. The most recent project involving All American <br />Asphalt was the Main Street Rehabilitation from MacArthur Boulevard to Dyer Road in <br />FY 2023/2024. <br />Proiect Delive <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes construction <br />management and materials testing. As indicated in the Cost Analysis (Exhibit 4) and as <br />summarized in the table below, the estimated total construction delivery cost of the <br />project is $2,374,980. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$1,899,983 <br />Construction Administration, Inspection, Testing <br />$284,998 <br />Contract Contingencies <br />$189,999 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$2,374,980 <br />In order to account for the widespread price increases in construction material, Staff <br />recommends reallocating $671,980 in unspent Road Maintenance and Rehabilitation <br />Account (SB-1) funds to supplement the existing construction funding. Funding was <br />originally allocated to the Fairview Street Rehabilitation from South City Limits to <br />Segerstrom Avenue Improvement (No. 21-6978) Project. The Fairview Rehab Project <br />will be fully funded with a new budget in the upcoming FY 2023-24 Capital Improvement <br />Program (CIP) (Exhibit 5). <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2021-48 was filed for the project. <br />FISCAL IMPACT <br />Project 21-6979 and Project 21-6980 are the numbers assigned to the funding for <br />tracking of all expenditures to deliver the construction of this project indicated in the <br />Cost Analysis. The total construction delivery cost of the project is $2,374,980, which <br />includes construction, contract administration, inspection, testing, and an authorized <br />contingency. Monies will be reallocated from Project No. 21-6978 to fund this <br />agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.