My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF (7)
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 4:54:11 PM
Creation date
10/12/2023 4:53:40 PM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-2023-159
Agency
Public Works
Council Approval Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Preparer: AV <br />Reviewer: GC -Nick Hsieh <br />Project No.: 22-6989 <br />Date Revised: 05/30/23 <br />Date Reviewed: <br />EXHIBIT B - TABLE 2 <br />COST ESTIMATE- GARDEN GROVE <br />22-6989 - Westminster Avenue Rehabilitation <br />Newhope St to Harbor Blvd <br />Hems <br />-.ENGINEER <br />No. <br />N0. <br />DESCRT)?T ON <br />UNIT <br />QXrANTITY <br />'tiNIT PRICE COST <br />1 <br />Unclassified Excavation <br />Cy <br />170 <br />ice, ; <br />t,$ ,6�;<%z Woo," <br />$ 47,600.00 <br />2 <br />Asphalt Concrete <br />TN <br />210 <br />`aXY23�?: $ 42,000.00 <br />3 <br />Cold Mill (2") <br />SF <br />35,000 <br />;{,._�. 4 07� $ 35,000.00 <br />4 <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />500 <br />'!$, ' �_(_ 0, $ 130,000.00 <br />5 <br />PCC Sidewalk (T=4") <br />SF <br />1,400 <br />- . I> ;, a $ 19,600.00 <br />6 <br />PCC Curb Ramp <br />SF <br />1,000 <br />T <br />$ 18,000,00 <br />7 <br />Truncated Domes <br />EA <br />3 <br />,'_; �Q $ 4,500.00 <br />8 <br />PCC Curb and Gutter (Type A-2-8) <br />LF <br />300 <br />$ 15,000.00 <br />Furnish and Install Water Valve Lid and Slip Can <br />! '?� <br />9 <br />Per GG STD <br />EA <br />26 <br />j_ �,- y", $ 31,200.00 <br />10 <br />Adjust Manhole Frame and Cover Per GG STD. <br />EA <br />2 <br />I 4 irk <br />j gig; <br />1 <br />Adjust Manhole Frame and Cover Per OCSD STD. <br />EA <br />2 <br />j A. f - $ 4,000.00 <br />12 <br />Furnish and Install Manhole Per GG STD. <br />EA <br />1 <br />2,500.00 <br />13 <br />Install FABCO CPS Unit <br />EA <br />5 <br />t` ° <br />1" ,Q„1_D $ 8,000.00 <br />14 <br />Catch Basin Tap Slab Reconstruction <br />LS <br />1 <br />$ ,,-, 01 „tj $ 10,000.00 <br />15 <br />Project Advertisement Sign <br />EA <br />1 <br />.. <br />- NON $ 1,000.00 <br />16 Signing and Striping LS 1 a <br />�,$ �Q� $ 13,000.00 <br />17 As Built Plans LS I j :, $ 1,500.00 <br />x \ <br />Q <br />t ..UUT T -.... l' f 'i� UI `4 Y,� t) µtl .: <br />T[ON p$ ,.x r r� `$ 386;900.00 <br />Design Engineering <br />15% $ 58,000.00 <br />Contingency <br />to% $ 39,000.00 <br />Construction Engineering <br />15% $ 58,000.00 <br />I OT�L I RQd>EC{I �O$ C . 4 <br />$ ; ;54 ' 00.90; <br />
The URL can be used to link to this page
Your browser does not support the video tag.