My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Construction Contract for the Westminster Avenue Rehabilitation Project from Newhope Street to Harbor Boulevard and Appropriation Adjustment
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Item 12 - Construction Contract for the Westminster Avenue Rehabilitation Project from Newhope Street to Harbor Boulevard and Appropriation Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:50:52 AM
Creation date
10/24/2023 11:33:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Project No.: 22-6989 <br />Preparers AV Date Revised: 05 30/23 <br />Reviewer: GC - Nick Hsieh Date Reviewed: <br />EXHIBIT B - TABLE 2 <br />COST ESTIMATE- GARDEN GROVE <br />22-6989 - Westminster Avenue Rehabilitation <br />Newhope St to Harbor Blvd <br />1 <br />r w <br />� ..�^...t:�5r�'u- <br />NS- M' ^ .,,.,F,..... <br />Unclassified Excavation <br />........,. <br />.., ,w <br />l�N1vE>ui <br />}p� <br />._..,.. .".,..,....._ .x ,...,,... <br />Cy <br />170 <br />$ 47,600.00 <br />2 <br />Asphalt Concrete <br />TN <br />210 <br />$ 42,000.00 <br />3 <br />Cold Mill (2") <br />SF <br />35,000 <br />w$ 35,000.00 <br />4 <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />500 <br />$ 130,000.00 <br />5 <br />PCC Sidewalk (T= 4") <br />SF <br />1,400 <br />_ - $ 19,600,00 <br />6 <br />PCC Curb Ramp <br />SF <br />1,000 <br />;r $ 18,000.00 <br />7 <br />Truncated Domes <br />EA <br />3 <br />S 4,500.00 <br />8 <br />PCC Curb and Gutter (Type A-2-8) <br />LF <br />300 <br />- $ 15,000.00 <br />9 <br />Furnish and Install Water Valve Lid and Slip Can <br />Per GG STD <br />EA <br />26 <br />e $ 31,200.00 <br />10 <br />Adjust Manhole Frame and Cover Per GG STD. <br />EA <br />2 <br />$ 4,000,00 <br />11 <br />Adjust Manhole Frame and Cover Per OCSD STD, <br />EA <br />2 <br />a $ 4,000.00 <br />12 <br />Furnish and Install Manhole Per GG STD, <br />EA <br />1 <br />". , $ 2,500.00 <br />13 <br />Install FABCO CPS Unit <br />EA <br />5 <br />3 ; �. $ 8,000.00 <br />14 <br />Catch Basin Top Slab Reconstruction <br />LS <br />1 <br />V11, =� �}.N:"a1 $ 10,000,00 <br />15 <br />Project Advertisement Sign <br />EA <br />1 <br />$ 1,000.00 <br />16 <br />Signing and Striping <br />LS <br />1 <br />Q $ 13,000.00 <br />17 <br />As-BuiltPlans <br />LS <br />] <br />$ 1,500.00 <br />Design Engineering <br />15% $ 58,000.00 <br />Contin envy <br />10% $ 39,000.00 <br />•.zsx..'i�'^°f <br />f3.,..m_.,m <br />� m � � <br />.: �. <br />Construction Engineering <br />T e <br />_.. <br />, <br />qoa <br />
The URL can be used to link to this page
Your browser does not support the video tag.