My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Construction Contract for the Westminster Avenue Rehabilitation Project from Newhope Street to Harbor Boulevard and Appropriation Adjustment
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Item 12 - Construction Contract for the Westminster Avenue Rehabilitation Project from Newhope Street to Harbor Boulevard and Appropriation Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:50:52 AM
Creation date
10/24/2023 11:33:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6989 <br />WESTMINSTER AVENUE REHABILITATION <br />FROM NEWHOPE Sr TO HARBOR BLVD <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: R.J. NOBLE COMPANY <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qtyi <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation • <br />1,040 <br />CY <br />$ <br />S <br />191.00 <br />198,640.00 <br />2 <br />Asphalt Concrete • <br />1,450 <br />n J <br />165.00 <br />$ <br />239,250.00 <br />3 <br />Cold Mill (2") • <br />213.000 <br />SF <br />$ <br />$ <br />0.70 <br />149,100.00 <br />4 <br />Asphalt Rubber Hot Mix (ARHM) <br />3,000 <br />IN <br />$ <br />S <br />164.00 <br />492,000.00 <br />S <br />PCC Sidewalk (T=4") <br />7,2W <br />SF <br />S <br />S <br />11.00 <br />79,200.00 <br />6 <br />PCC Driveway Approach (T=8") <br />1,100 <br />SF <br />$ <br />S <br />17.50 <br />19,250.00 <br />7 <br />PCC Curb Ramp <br />1,800 <br />SF <br />$ <br />$ <br />31.00 <br />55,800.00 <br />8 <br />Truncated Domes <br />3 <br />EA <br />S <br />1 S <br />1,100.00 <br />3,300.00 <br />9 <br />PCC Curb and Gutter (Type A-2-8) <br />800 <br />LF <br />S <br />S <br />80.50 <br />64,400.00 <br />10 <br />PCC (B-1 I Curb (Including Steel <br />100 <br />LF <br />$ <br />$ <br />Rebar Dowels) <br />49.50 <br />4,950.00 <br />11 <br />Root Shave- <br />5 <br />EA <br />$ <br />$ <br />550.00 <br />2,750.00 <br />12 <br />Adjust Water Valve Frame and <br />22 <br />EA <br />S <br />5 <br />Cover Per CSA STD. <br />1,550.00 <br />34)100.00 <br />13 <br />Furnish and Install Water Valve Lid <br />26 <br />EA <br />$ <br />$ <br />and Slip Can Per GG STD. <br />304.00 <br />7,904.00 <br />P-1 ofP-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.