Laserfiche WebLink
EXHIBIT 4 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 22-6989: Westminster Ave Rehabilitation <br />from Newhope St to Harbor Blvd <br />Construction Contract <br />$ <br />1,643,676.00 <br />Contract Administration, Inspection and Testing <br />$ <br />246,551.00 <br />Contingencies <br />$ <br />164,368.00 <br />Design Engineering (Garden Grove) <br />$ <br />58,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />2,112,595.00 <br />