My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Construction Contract for the Westminster Avenue Rehabilitation Project from Newhope Street to Harbor Boulevard and Appropriation Adjustment
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Item 12 - Construction Contract for the Westminster Avenue Rehabilitation Project from Newhope Street to Harbor Boulevard and Appropriation Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:50:52 AM
Creation date
10/24/2023 11:33:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 6 <br />PROJECT TITLE: <br />WestminsterA venue Rehabilitation: <br />Newhope St to Harbor Blvd <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP 1 <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Roadway reconstruction along with miscellaneous concrete repairs <br />to address accessibility and drainage issues along this segment of <br />roadway. <br />PROJECT NEED: <br />This segment of WestminsterA venue has been identified as a priority <br />by the City's Pavement Management System. The pavement is <br />deteriorating due to weather, age, and heavy usage. <br />PROJECT COSTS FY 21/22! FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 1. 3 8 9 .o o o - - - - - - <br />Engineering 111,000 - - - <br />TOTAL 1,500,000 - - - - - - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />RMRASB1 1.s� � .000 - - - - - - <br />TOTAL 1,500,000 - - - - - - <br />DIVISION: <br />Design Engineering <br />CONTACT: <br />Mike Ortiz, Senior Civil Engineer <br />DATE: <br />11-May-2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.