Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 23-026 <br />WATER RESOURCES FUNCTIONAL SPECIFICATIONS DEVELOPMENT AND SCADA <br />PROGRAMMING SERVICES <br />10. Provide all necessary equipment to competently perform and complete work as <br />specified. <br />I. SAFETY <br />Proposer shall be solely and completely responsible for the condition of the project site, including <br />safety of all persons and properties during the performance of the work. In addition, proper safety <br />equipment must be worn at all times. These requirements shall apply continuously until the <br />contract is terminated and shall not be limited to normal working hours. <br />The Consultant shall assure that each employee or subcontractor under the contractor's <br />supervision is trained in the work practices necessary to safely perform his or her job. <br />The Consultant's drivers/delivery crews shall be HAZMAT trained and certified in safety <br />measures to prevent accidents endangering personnel and property. Hazardous Materials shall <br />be clearly marked with the proper shipping name and identification number as required by the <br />Department of Transportation. The Consultant shall provide current, applicable and required <br />Material Safety Data Sheets (MSDS) at any time during the contract as requested by the City of <br />Santa Ana. <br />J. INSURANCE REQUIREMENTS <br />The successful bidders shall furnish the City with original copies of valid insurance policies herein <br />required upon execution of the contract and shall maintain said policies in full force and effect at <br />all times during the term of this contract. Said insurance policies shall comply with all <br />requirements set forth in these specifications. Consultant(s) shall keep a current certificate of <br />insurance at the City of Santa Ana at all times and shall immediately report any changes to the <br />City. <br />K. FEE SCHEDULE <br />The Consultant shall submit a fee schedule and labor rates as described in Section III.B.3 of <br />RFP. The Consultant shall refer to APPENDIX A and APPENDIX B for additional information <br />regarding Crooke Station and Cambridge Station respectively. No separately stated freight or <br />deliveries will be considered. Bidders shall include all costs in the unit price bid. The Consultant's <br />delivered product pricing shall be inclusive of all freight/unloading/handling and delivery charged. <br />The City intends to replace the control panels and related instrumentation and electrical <br />components at the sites described below (work to be performed by a separate Contract): <br />1. Crooke Pump Station consisting of (detailed plansets provided in Appendix A): <br />a. 3 Booster pumps <br />b. 1 Reservoir <br />c. 2 Groundwater wells <br />City of Santa Ana RFP 23-026 <br />Water Resources Functional Specifications Development and SCADA Programming Services <br />Page 20 <br />