My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - SCADA Functional Specifications and Programming Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Item 17 - SCADA Functional Specifications and Programming Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:55:32 AM
Creation date
10/24/2023 11:34:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
9/19/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 23-026 <br />WATER RESOURCES FUNCTIONAL SPECIFICATIONS DEVELOPMENT AND SCADA <br />PROGRAMMING SERVICES <br />2. Cambridge Pump Station consisting of (detailed plansets provided in Appendix <br />B): <br />a. 3 Booster pumps <br />b. 1 Reservoir <br />The fee proposal shall be outlined as follows for Crooke Station and for Cambridge Station: <br />1. Control Panel Drawings <br />a. Fee per Site <br />2. Functional Specifications <br />b. Fee per Site <br />3. Programming and Testing Specifications <br />c. Fee per Site <br />d. Assume 20 hours of witness testing/on-site services per site <br />4. Source Control <br />a. Fee for initial PLC program collection <br />b. Fee for establishing functioning Source Control database, standards and <br />procedures <br />c. Annual budget for processing check-in/check-out requests <br />i. Assume 4 requests per month <br />5. Change Control <br />a. Fee for establishing functioning Change Control forms, standards and procedures <br />b. Annual budget for processing/documenting change control requests <br />i. Assume 4 requests per month <br />6. Firm's standard hourly fee schedules <br />Furthermore, the Consultant shall submit additional labor, material and rental equipment <br />rates along with fee schedule. Consultant's labor and equipment rate sheet shall list rates for <br />all labor designations, equipment, rentals, and materials. The bid items specified in the fee <br />schedule are for reference purposes only. Labor increases shall be subject to mutually agreeable <br />terms between the City and the Consultant. The City may request related services that will be <br />paid at the vendor's standard labor and equipment rate submitted. Fee proposal shall be outlined <br />as follows: <br />---End of SCOPE OF WORK Section --- <br />City of Santa Ana RFP 23-026 <br />Water Resources Functional Specifications Development and SCADA Programming Services <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.