Laserfiche WebLink
Crooke Pump Station Func. Spec Dev & Programming Scope of Work ENTERPRISE <br />EA Project Number: EA23CSA090, 0.0.0 AUTOMATION <br />A TETRA TECH COMPANY <br />Project initiation Deliverables <br />5.3 Design Review <br />At the onset of this project, EA will review design documentation that the City's contractor has <br />developed for this project. The exact scope of this task will be determined by the City and EA's <br />project team on an as -needed basis but will likely include a review of the 100% P&IDs, electrical <br />drawings, and MCC design. <br />Additionally, EA will review the MCC fabricator's ready for construction drawing set for alignment <br />with the design documentation. EA will provide redlined comments to the designer following this <br />review to be incorporated into the final design. <br />Design Review Deliverables <br />1. 100% Design review notes <br />2. MCC construction drawing review notes <br />None <br />5.4 Control Panel Drawings <br />EA will be responsible for the development of control panel drawings for Crooke Pump Station. <br />This pump station consists of 3 booster pumps,1 reservoir, and 2 groundwater wells. The Crooke <br />Pump Station Control Panel Design will conform to existing control panel standards and will <br />include the following at a minimum: <br />• Front panel layout drawing <br />• Back panel layout drawing <br />• Power distribution drawing <br />• Communication network drawing <br />• Analog inputs/outputs drawing <br />• Digital input/output drawing <br />• Bill of Materials <br />• 1/0 list with tag names <br />• Additional specifications (standard provided by the City) <br />