Laserfiche WebLink
Crooke Pump Station Func. Spec Dev & Programming Scope of Work <br />EA Project Number: EA23CSA090, 0.0.0 <br />ENTERPRISE <br />AUTOMATION <br />A TETRA TECH COMPANY <br />5.5.7 Network drawings <br />To accompany the design documentation package, EA will develop a basic network diagram for <br />Crooke Pump Station showing all equipment and their network connections. <br />5.5.8 Design Review Workshop <br />EA will host a Design Review Workshop to review the developed design specifications. The City <br />will review the submitted specifications and provide comments and feedback during this <br />workshop. <br />EA will update the specifications to final versions following this workshop. <br />Functional Specifications Deliverables <br />Client <br />1. <br />Deliverables <br />Design workshop meeting minutes <br />2. <br />Draft and Final 10 and equipment lists <br />3. <br />Draft and Final Functional Specification <br />4. <br />Draft and Final SCADA Design Specification <br />5. <br />Draft and Final OIT Design Specification <br />6. <br />Draft and Final network drawings <br />7. <br />Design Review Workshop meeting minutes <br />Site investigation notes <br />5.6 Programming & Testing Specifications <br />During the programming and testing phases of this project, EA will be responsible for: <br />• Developing test documentation for PLC, SCADA, OIT, and panel testing <br />• Oversee witnessed testing procedures <br />• Provide onsite startup support for the City's contractor and integrator <br />The test procedures and checklists EA develops will be intended to guide the SCADA FAT, panel <br />FAT, and SAT. These three comprehensive, witnessed testing sessions will ensure the SCADA <br />configuration, PLC program, OIT program, and fabricated panel are all tested before they are <br />deployed onsite and once more upon startup. EA will submit these test procedures and checklists <br />to the City for review and feedback. Once approved, EA will hand over the three test procedures <br />and checklists to the City's contractor and integrator. <br />In addition to the development of the test documentation, EA will oversee the SCADA FAT, panel <br />FAT, and SAT onsite. For each test, EA will ensure that all non -conformances are logged and, if <br />necessary, will use as needed support budget to attend re -testing. <br />EA has included budget for as needed support for both the contractor and integrator during the <br />programming and testing phase. <br />