Laserfiche WebLink
Treatment Systems in the Basin subject to the provisions of this Agreement. OCWD will also <br />fund a portion of the operation and maintenance costs of those facilities. <br />2.2 HAS Compounds and Reopener. The Parties recognize the necessity of <br />and commit to a high level of coordination to expeditiously design, construct and operate HAS <br />Treatment Systems to remove PFAS from the Basin where HAS is detected in a Producer's <br />existing or anticipated) Water Producing Facilities at or above 80% of an applicable RL or MCL. <br />The Parties acknowledge that additional compounds within the HAS family may become <br />regulated during the term of this Agreement. To the extent the Treatment Systems developed <br />under this Agreement requires modification to treat PFAS that becomes regulated after the <br />Effective Date, the Parties will, where necessary and mutually agreed upon, amend this Agreement <br />to provide for treatment of additional compounds in the PFAS family. <br />3. PLANNING. <br />3.1 Planning Study. OCWD has retained a consultant to prepare a "Planning <br />Study" to evaluate the Producers' water systems, any of their Water Producing Facilities impacted <br />by PFAS ("Impacted Wells"), and potential locations for construction of PFAS Treatment <br />Systems for Impacted Wells. OCWD shall cause the consultant to actively consult with Producers <br />in connection with preparation of the Planning Study. OCWD shall cause the consultant to provide <br />a final Planning Study report to OCWD and Producers concurrently. <br />3.2 Pilot Study. OCWD shall perform a PFAS treatment "Pilot Study" to <br />evaluate different treatment technologies to remove PFAS from groundwater. <br />3.3 Treatment Systems. OCWD shall use the results of the Planning Study and <br />the Pilot Study to reasonably determine the type and final design of the Treatment Systems to treat <br />PFAS contamination in the groundwater produced by Impacted Wells to levels below the RL or <br />MCL. Development of the final design of Treatment Systems will consider 30-year lifecycle costs, <br />including but not limited to Treatment System footprint and physical setting, relative land values, <br />the proximity to existing water infrastructure and energy sources, operational costs and limitations, <br />and any HAS treatment studies conducted by Producers. The Treatment Systems will be designed <br />for a 30-year useful life. If OCWD and a Producer mutually agree, a Treatment System that can <br />remove PFAS contamination down to non -detect concentrations, depending upon site specific <br />circumstances, may be designed and constructed. <br />3.4 Enhancements/Additions to Treatment System. If Producer desires to <br />construct additions or enhancements to the PFAS Treatment System beyond what OCWD <br />determines is the appropriate Treatment System, then OCWD will reasonably estimate the cost of <br />those additions or enhancements (including planning costs, design costs, capital costs and <br />operation and maintenance ["O&M"] costs) with assistance and input from Producer(s). For <br />OCWD-Built facilities (defined below), OCWD shall include the additions or enhancements in the <br />design and construction of the treatment facilities upon OCWD determination of feasibility of <br />efficiently operating the Treatment Systems with the requested additions or enhancements. <br />Producer shall reimburse OCWD for all costs associated with the OCWD-Built addition or <br />enhancement constructed by OCWD. For Producer Built Treatment Systems that contain additions <br />or enhancements beyond what OCWD determines to be an appropriate Treatment System, <br />2629/022499*087 <br />14979764.1 a04/17/20 -4-