My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Resolutions for Wells 27 and 28 PFAS Treatment System Funding
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Item 22 - Resolutions for Wells 27 and 28 PFAS Treatment System Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:45:16 AM
Creation date
10/24/2023 11:36:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Producers shall have no right of reimbursement from OCWD for Producers' costs attributable to <br />such additions or enhancements. <br />3.5 Producer Assistance. Producers shall support and assist OCWD in <br />connection with the Planning Study, Pilot Study, and development of what constitutes an <br />appropriate Treatment System design. "Support and assist," as used in this Agreement means <br />timely providing reasonable staff time and available data/technical information where requested <br />by OCWD to ensure OCWD has sufficient information to timely complete its obligations under <br />this Agreement. <br />3.6 Untested Water Producing Facilities. OCWD reserves the discretion to <br />delay the design and to not construct Treatment Facilities at Water Producing Facilities that have <br />not been individually tested for PFAS, or which have not demonstrated consistent exceedance of <br />an applicable PFAS RL or MCL. <br />4. DESIGN AND CONSTRUCTION OF PFAS TREATMENT FACILITIES. <br />4.1 Fundiniz. OCWD shall fund the reasonable cost to design and construct the <br />Treatment System, except for necessary real property and entitlements for siting the Treatment <br />System as described in Section 4.4. OCWD's funding obligations apply both to OCWD-Built or <br />Producer -Built Treatment Systems, as defined below. OCWD's funding obligations include <br />planning, design, and construction of the Treatment Systems whether OCWD-Built or Producer - <br />Built. <br />4.2 OCWD Construction or Reimbursement. The Producer shall elect either: <br />A. to have the Treatment System designed and built by OCWD <br />OCWD-Built"); or <br />B. to be reimbursed for having the Treatment System designed and <br />built by the Producer ("Producer -Built"). <br />4.3 CEQA. In connection with the proposed Treatment System for Impacted <br />Wells, the Parties shall work together to determine the best plan for and the lead agency for the <br />purpose of complying with the California Environmental Quality Act ("CEQA"). Where a <br />Producer serves as lead agency for a CEQA project, OCWD shall serve as a Responsible Agency <br />and approve the portions of the CEQA project that OCWD will carry out. OCWD shall fund <br />CEQA expenses incurred in connection with the Treatment System whether it is a Lead Agency <br />or a Responsible Agency. Upon a Producer's request, OCWD shall prepare necessary CEQA <br />documents for the Treatment System. OCWD shall fund any reasonable CEQA mitigation cost <br />excluding land acquisition expenses. <br />4.4 Property Acquisition, Entitlements. <br />A. Land and Rights of Way. Each Producer shall secure at its expense <br />any land and/or right of way necessary to construct the Treatment System(s). <br />2629/022499-0087 <br />14979764.1 a04/1720 -5-
The URL can be used to link to this page
Your browser does not support the video tag.