Laserfiche WebLink
CITY OF SANTA ANA <br /> <br />STREET SWEEPING SERVICES 32 <br /> <br /> <br /> 1. Clean Street Condition – Clean streets with no debris trails left behind <br />2. Contractor – Refers to the individual, partnership, or corporation that is awarded a contract <br />by the City upon conclusion of this RFP process. <br />3. City Holidays Observed – New Year's Day, Martin Luther King, Presidents’ Day Memorial <br />Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Day After <br />Thanksgiving, Christmas Eve and Christmas Day. <br />4. Curb Mile – measurement of curbing of streets and medians and equal to 5,280 linear feet. <br />5. Curb-to-Curb – area within the curb limits of the street including medians, intersections and <br />street ends. <br />6. Debris – litter, rubbish, leaves, sand, debris trail, dirt, garbage, and other foreign material. <br />7. Inclement Weather – weather conditions that prohibit the effective operation of sweeping <br />operations. <br />8. Linear Mile – measurement of actual miles driven in order to satisfactorily clean streets to <br />the City standard, which may require multiple passes depending on condition and width of <br />street. <br />9. Re-sweep – sweep required when previous sweeps are deemed by the City to be below <br />standard or when a street or sections of a street are missed during regularly scheduled <br />operation. Such re- sweeps will be at no additional cost with up to two re-sweeps performed <br />to City satisfaction. <br />10. Special Sweeping (Sweeps) – sweeping involving special events, parades, inclement <br />weather, roadway hazards, spills (similar, but not limited to oil, paper, debris, etc.) and City <br />surface parking lots. <br />11. Street – all paved dedicated public rights-of-way within the existing or future City limits. <br />12. Sweeper – Sweeping machine. <br />13. Travel Speed – sweeper operator must maintain a speed of no more than eight (8) miles <br />per hour, or other agreed upon speed by the City, while the sweeping broom is lowered in <br />the operating position. <br />II. COMPENSATION <br />1. Invoices <br />a. The Contractor shall submit a monthly invoice by the 15th of the month to the City for the <br />services rendered in the prior month. <br />b. All invoices for work performed under this contract shall be submitted electronically in a <br />Microsoft Excel 2016 format or newer, or other format approved by the City Projects <br />Manager or designee. <br /> <br /> The invoice shall include the following information at a minimum: <br />i. Contractor’s invoice number <br />ii. Beginning and ending dates for services <br />iii. City work order number (if applicable) <br />iv. Work site address/location (if applicable) <br />v. Unit cost, subtotals and total for invoice <br />vi. Curb miles swept authenticated by GPS reports and maps. <br />vii. GPS Route Maps (if requested by City)