My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOORE LACOFANO, GOLTSMAN, INC.
Clerk
>
Contracts / Agreements
>
M
>
MOORE LACOFANO, GOLTSMAN, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 10:56:18 AM
Creation date
10/26/2023 11:54:54 AM
Metadata
Fields
Template:
Contracts
Company Name
MOORE LACOFANO, GOLTSMAN, INC.
Contract #
A-2023-176
Agency
Planning & Building
Council Approval Date
10/17/2023
Expiration Date
10/31/2025
Insurance Exp Date
8/31/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
special plan areas exist. This approach to land use regulation can make implementation challenging for <br />applicants and City staff, and staff is looking for ways to simplify regulation, both by using the newer <br />specific plans and specific development plans to inform standards for the Focus Areas and to subsume <br />built -out specific developments into existing or newly created zoning districts. In addition, the Citywide <br />Design Guidelines apply to all types of development in the community. Given recent State legislation <br />that requires application of objective design standards (ODS) to virtually all residential and mixed -use <br />developments, subjective guidelines can no longer be used to review residential development <br />applications. <br />The MIG Team will undertake an in-depth audit of all such plans and the Citywide Design Guidelines. <br />With regard to the plans, we will assess whether each should be retained as stand-alone plan, updated, <br />deleted, or merged with other plans/specific developments/zoning districts. The audit will be produced <br />in the form of an on-line matrix to allow for easy reading and tracking as to disposition of each plan <br />area. For the Citywide Design Guidelines, we will annotate the existing document to indicate which <br />design guidelines can be incorporated into the updated Zoning Code as ODS. <br />Subtask 3.2: Prepare Comprehensive Chapter 41 Audit and Update Guidance Matrix <br />Altogether, subtasks 1.2, 2.2, and 3.1 will provide guidance regarding the structure and content for the <br />updated Zoning Code. A comprehensive audit of all Chapter 41 articles is also needed to establish <br />guidance for the work tasks ahead. For this task, the MIG Team will complete a comprehensive audit of <br />Chapter4l to identify all issues to be addressed and the options for addressing them, including revisions <br />needed to respond to recently adopted General Plan policy. This audit will draw from: <br />• Our independent review of the General Plan <br />• Stakeholder interviews (subtask 4.2) <br />• Recent legislation and case law <br />• Discussions with City staff <br />• Knowledge of best practices <br />The audit largely will be in an online matrix format, divided into these broad categories: <br />1. General Plan policies to be addressed via zoning regulations <br />2. New State laws needing to be incorporated <br />3. Each of the Chapter 41 articles <br />We expect that the matrix will be an evolving document as we progress through the update process. <br />MIG will prepare this diagnosis in a format that can be used to track revisions during the drafting process <br />and as a source for the preparation of staff report(s) when the draft Zoning Code goes through the public <br />review and adoption process. <br />We will also audit the Municipal Code for other sections that cross reference or relate to Chapter 41 to <br />identify what updates may be needed to ensure consistency. <br />Task 3 Meetings: <br />Meetings to discuss the audits (3 budgeted) <br />MIG, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.