Laserfiche WebLink
<67) <br />GEOCON <br />GERALD KASMAN, CEG <br />SENIOR GEOLOGIST <br />City of Santa Ana <br />RFP 23-123 — On -Call Geotechnical Engineering Services <br />Mr. Kasman has 34 years of professional experience <br />performing and managing multidisciplinary <br />geotechnical investigations for major developments <br />including tunnel and pipeline alignments, <br />embankments, transportation infrastructure, and <br />residential, commercial, and municipal projects. Mr. <br />Kasman's technical experience with projects requiring <br />complex geological studies includes fault rupture <br />hazard investigations, seismicity and ground motion <br />studies, geophysical surveys, slope stability <br />investigations, and geologic hazard evaluations. As <br />such, he has extensive experience in detailed field mapping, aerial <br />photograph interpretation, continuous -core logging of rock and alluvial <br />deposits, trenching, downhole logging, tunneling, and instrumentation. Mr. <br />Kasman is responsible for the development of technical scopes for <br />investigations, training and resourcing of personnel, maintaining project <br />schedules and budgets, complex engineering geology and seismic studies, <br />and preparation of technical reports and letters. His experience includes: <br />EXPERIENCE <br />34 years <br />EDUCATION <br />BA, Earth Science, <br />California State University, <br />Northridge <br />- Post Graduate Studies <br />Engineering Geology <br />QFf:ICTRAT1nNC <br />- CA: Certified Engineering <br />Geologist, No. 2251 <br />- CA: Professional <br />Geologist, No. 7195 <br />CERTIFICATIONS <br />- PEC Safel-and Certified <br />- Geokon Certified <br />Instrument Installer <br />CITY OF WEST HOLLYWOOD, PLUMMER PARK, WEST HOLLYWOOD, CALIFORNIA - OSHA: 40-Hour <br />Mr. Kasman was the senior geologist for the Phase I additions and - OSHA 8-Hour Refresher <br />improvements that included a single -story child care structure and playground - MSHA PT 48 <br />area constructed over a single -level subterranean parking garage, new sports ORGANIZATIONS <br />courts, and paving for support of vehicles. The purpose of the investigation - Association of <br />was to evaluate subsurface soil and geologic conditions in the area of Engineering Geologists <br />proposed development and determine soil permeability rates for an on -site <br />storm water infiltration system. Mr. Kasman supervised the field exploration program and performed a <br />geologic/seismic hazard evaluation for the development. <br />Los ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS, EL CARISO PARK, Los ANGELES, CALIFORNIA <br />Mr. Kasman was the senior geologist who prepared the geological portion of the geotechnical investigation <br />report for improvements at El Cariso Park. Improvements consisted of two soccer fields with light standards, <br />the replacement of two single -story comfort stations, new ADA compliant bleachers at five existing baseball <br />fields, six new picnic shelters, an approximately 54,000 square foot universally accessible playground, <br />replacement of two play areas, enlargement of the existing northern parking lot, and upgrades and <br />replacement of existing walkways for ADA compliancy <br />BEAR VALLEY ROAD BRIDGE REHABILITATION $ WIDENING, VICTORVILLE, CALIFORNIA <br />Geocon performed a geotechnical investigation for the rehabilitation, widening, and seismic retrofit of Bear <br />Valley Road at the Burlington North Santa Fe railroad crossing. Mr. Kasman developed the scope of work of <br />the investigation, performed the geologic studies to incorporate into the geotechnical report, and authored the <br />geology section of the geotechnical report. <br />Geocon 2023-333 Page 7 August 28, 2023 <br />