<67)
<br />GEOCON
<br />GERALD KASMAN, CEG
<br />SENIOR GEOLOGIST
<br />City of Santa Ana
<br />RFP 23-123 — On -Call Geotechnical Engineering Services
<br />Mr. Kasman has 34 years of professional experience
<br />performing and managing multidisciplinary
<br />geotechnical investigations for major developments
<br />including tunnel and pipeline alignments,
<br />embankments, transportation infrastructure, and
<br />residential, commercial, and municipal projects. Mr.
<br />Kasman's technical experience with projects requiring
<br />complex geological studies includes fault rupture
<br />hazard investigations, seismicity and ground motion
<br />studies, geophysical surveys, slope stability
<br />investigations, and geologic hazard evaluations. As
<br />such, he has extensive experience in detailed field mapping, aerial
<br />photograph interpretation, continuous -core logging of rock and alluvial
<br />deposits, trenching, downhole logging, tunneling, and instrumentation. Mr.
<br />Kasman is responsible for the development of technical scopes for
<br />investigations, training and resourcing of personnel, maintaining project
<br />schedules and budgets, complex engineering geology and seismic studies,
<br />and preparation of technical reports and letters. His experience includes:
<br />EXPERIENCE
<br />34 years
<br />EDUCATION
<br />BA, Earth Science,
<br />California State University,
<br />Northridge
<br />- Post Graduate Studies
<br />Engineering Geology
<br />QFf:ICTRAT1nNC
<br />- CA: Certified Engineering
<br />Geologist, No. 2251
<br />- CA: Professional
<br />Geologist, No. 7195
<br />CERTIFICATIONS
<br />- PEC Safel-and Certified
<br />- Geokon Certified
<br />Instrument Installer
<br />CITY OF WEST HOLLYWOOD, PLUMMER PARK, WEST HOLLYWOOD, CALIFORNIA - OSHA: 40-Hour
<br />Mr. Kasman was the senior geologist for the Phase I additions and - OSHA 8-Hour Refresher
<br />improvements that included a single -story child care structure and playground - MSHA PT 48
<br />area constructed over a single -level subterranean parking garage, new sports ORGANIZATIONS
<br />courts, and paving for support of vehicles. The purpose of the investigation - Association of
<br />was to evaluate subsurface soil and geologic conditions in the area of Engineering Geologists
<br />proposed development and determine soil permeability rates for an on -site
<br />storm water infiltration system. Mr. Kasman supervised the field exploration program and performed a
<br />geologic/seismic hazard evaluation for the development.
<br />Los ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS, EL CARISO PARK, Los ANGELES, CALIFORNIA
<br />Mr. Kasman was the senior geologist who prepared the geological portion of the geotechnical investigation
<br />report for improvements at El Cariso Park. Improvements consisted of two soccer fields with light standards,
<br />the replacement of two single -story comfort stations, new ADA compliant bleachers at five existing baseball
<br />fields, six new picnic shelters, an approximately 54,000 square foot universally accessible playground,
<br />replacement of two play areas, enlargement of the existing northern parking lot, and upgrades and
<br />replacement of existing walkways for ADA compliancy
<br />BEAR VALLEY ROAD BRIDGE REHABILITATION $ WIDENING, VICTORVILLE, CALIFORNIA
<br />Geocon performed a geotechnical investigation for the rehabilitation, widening, and seismic retrofit of Bear
<br />Valley Road at the Burlington North Santa Fe railroad crossing. Mr. Kasman developed the scope of work of
<br />the investigation, performed the geologic studies to incorporate into the geotechnical report, and authored the
<br />geology section of the geotechnical report.
<br />Geocon 2023-333 Page 7 August 28, 2023
<br />
|