Laserfiche WebLink
Grading and Earthwork: We will present earthwork criteria, including recommendations for new footing <br />subgrade preparation, recommendations for removal of unsuitable soil or fill, utility trench backfill, surface <br />drainage, and landscaping considerations, as necessary. Recommendations for import soil engineering and <br />compaction criteria will also be provided. <br />Foundations: Utilizing data collected during our exploration, we will recommend allowable vertical and lateral <br />bearing pressures for use in designing new spread -footing foundations. We will also provide foundation design <br />criteria including recommendations for minimum size, embedment depth, allowable vertical and lateral <br />capacities, and expected total and differential settlements. In addition, foundation recommendations for light <br />poles footings, fence post footings, and other free-standing canopy structures will be provided. <br />Lateral Earth Pressures: Recommended lateral earth pressures for active, at -rest and passive conditions, and <br />soil friction will be provided for use in retaining wall design. <br />Slabs -On -Grade: We will present concrete slab -on -grade design criteria, including recommendations for <br />subgrade preparation, moisture vapor mitigation and if necessary, non -expansive fill. <br />Asphalt Concrete and Portland Cement Concrete Pavements: We will provide recommendations for AC and <br />PCC pavement sections based on assumed traffic indices. We will also provide recommendations for <br />permeable and precast pavers. <br />Temporary Excavations: Utilizing the data collected during our exploration, we will present temporary <br />excavation guidelines (construction site safety is the responsibility of the contractor). <br />POST -REPORT SUBMITTAL SERVICES <br />A/E Team Coordination and Review: We will provide geotechnical support for the design team during <br />preparation of the project drawings and specifications. We will review the project drawings and specifications <br />for compliance with our geotechnical recommendations. <br />General Contractor Bidding Phase Services: Respond to bid questions including requests for information <br />(RFIs) as they relate to geotechnical items; and attend project meetings and participate in conference calls with <br />the design team. <br />SCHEDULE <br />Upon receipt of a written notice -to -proceed Leighton is prepared to immediately commence project planning <br />and scheduling. California law requires that Underground Service Alert (USA) be provided at least two working <br />days advanced notice to locate registered public utilities at the project site before exploration can begin. <br />Depending on potential site access constraints, weather and exploration equipment availability, field <br />exploration may begin five to ten working days after receipt of notice to proceed. Depending on project specific <br />scope details, our field exploration can be completed in one or more days. In general, geotechnical laboratory <br />testing will require approximately two weeks to complete after the conclusion of field exploration. Geotechnical <br />analyses and report preparation will then require an additional 2 weeks after completion of lab testing. We <br />anticipate we can provide our geotechnical report within approximately 4 weeks after field exploration. We can <br />provide preliminary results upon request in a technical memorandum as site -specific information becomes <br />available. <br />