My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Amend Agreement for AMI Consulting Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/21/2023 Regular
>
Item 18 - Amend Agreement for AMI Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 3:35:59 PM
Creation date
11/29/2023 2:18:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
11/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
philosophy, judgments and actions to be taken over the course of the project, The PEP will <br />outline the methods used for project controls related to: Quality Control, Risk/Issue/Change <br />Management, and Communications. In conjunction with the development of the PEP, an <br />integrated, milestone driven Microsoft project schedule will be developed to include work by <br />all vendors. <br />Project Management activities will include: maintaining the overall project schedule; working <br />with all project participants to monitor progress and adjusting the work plan as needed to stay <br />on schedule; facilitating regular project progress and other meetings; creating project status <br />reports as required with input from the City; working with the City to monitor the scope of <br />work of each vendor; identify, report, and track project issues and risks; and, track project <br />budget. Activities will include: <br />Preparation and dissemination of periodic update reports on AMI vendor's progress <br />• Providing clarifications and answers to AMI vendor's requests for information as needed <br />• Providing direction and technical assistance in resolving installation issues in the field <br />• Providing direction and technical assistance in resolving technology commissioning <br />issues that may arise <br />Deliverables: ProjectExecution Plan, Integrated Project Schedule, Monthly Status Reports, <br />Meeting Agendas, Meeting Notes/Action Items <br />The RFPs requested Implementation Pl'ogram Management Services is fairly limited in <br />scope, UtiliWorks experience has been that utilities implementing AMIIMDM, in most <br />cases, need more extensive support and expertise, As such the following sections layout <br />typical Program Management Services our teams normally provide to clients as "Optional <br />Services" We would leave the opportunity to discuss with Santa Ana if appropriate. <br />Implementation Program Management Optional Services <br />The City's Implementation Plan will ultimately drive the deployment schedule, but the <br />UtiliWorks' approach assumes the project will have two primary phases: Proof of Concept (POC) <br />Phase and Full Deployment Phase. UtiliWorks offers proven Implementation Program <br />Management Services beyond basic Project Management surrounding this deployment approach. <br />The business process and software integration activities fall under the POC phase. The intent <br />of the POC phase is to minimize the risk to the City's day-to-day operations, with deployment <br />of a select number of AMI meters, stabilization of the AMI network and end -to -end testing in <br />all meter -to -cash related processes. <br />Our optional services are presented for the City's consideration and are summarized below: <br />POC Planning - UtiliWorks will guide final POC implementation planning, accounting for <br />final contracts and any changes to the AMI implementation roadmap. The POC <br />implementation plan wilt finalize project details on meter quantities, equipment <br />acquisition, required materials, mass meter/endpoint installation, testing and training. <br />Systems Integration Workshop - UtiliWorks' Integration SME wilt lead a workshop with <br />the City and the designated vendor personnel to identify and confirm the systems <br />specific integration methodology and ensure alignment between each underlying <br />interface. <br />Systems Integration Oversight - UtitiWorks' Integration SME will coordinate and oversee <br />the systems integration effort that will occur during the POC. The intent is to have the <br />pre -identified systems interfaces designed, developed, tested and automated prior to <br />171Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.