Laserfiche WebLink
comments and recommendations that should <br />also be addressed and completed as part of this <br />deliverable. <br />Plans: Plans shall include, but are not limited to the <br />following: <br />Title Sheet <br />Civil Engineering <br />>� Site Erosion Plan <br />>� Parking lot <br />)� Horizontal and Vertical Control Plan <br />>� Grading And On -Site Drainage Plan <br />)) Site Utility Plan <br />Landscape Architectural <br />Site LayoUt/Construction Plans And Details <br />(including plumbing) <br />Site Sections, as applicable <br />Planting Plans/Details/Notes <br />>> Irrigation Plans/Details/CalCLI]ations/Notes <br />Architectural <br />>> Demolition Plans <br />>) Floor Plans <br />>) Reflected Ceiling Plans <br />>) Furniture Plans <br />>) Exterior Elevations <br />P Interior Elevations <br />Structural Engineering <br />)) Structural Design and Detailing <br />Mechanical Engineering & Plumbing <br />Electrical Engineering <br />)> Electrical Site Plan to include walkway/parking <br />lot lighting, irrigation. <br />• Photometrics. <br />• Location of panels, switchgear, meters <br />• Schedules <br />Details <br />Notes, specifications <br />Plan Check & Permits: Construction drawings shall <br />be in accordance with the 2019 California Building <br />Code and will require review/approval by the City <br />Planning and Building Agency. Additionally, this <br />would be subject to review by the Historic Resources <br />Commission. <br />TASK 4: Bid Support <br />Consultant shall provide support to the City during the <br />Bidding phase by assisting with questions, requests <br />for information/clarification, or conflicts arising out of <br />the bidding process. Consultant shall also attend pre - <br />proposal meeting. <br />TASK 5: Bid Advertisement, Construction Administration, <br />Record Drawings: <br />Bid Advertisement: Consultant shall provide <br />support to the City during the Bidding phase by <br />assisting with questions, requests for information/ <br />clarification, or conflicts arising out of the bidding <br />process. Consultant shall also attend pre -bid <br />meeting, if scheduled. <br />Construction Administration: Consultant <br />shall provide support to the City during the <br />Construction Administration phase by assisting <br />with questions, requests for information/ <br />clarification, and/or reviewing submittals. <br />Record Drawings i As -built Plans: Upon <br />construction completion, consultant shall <br />incorporate as -built information, as provided by <br />the General Contractor, into the drawing files to <br />provide record drawings for City archives. <br />CITY OF SANTAANA: CHEPA'S PARK MASTER PLAN AND COMMUNITY CENTER 1 17 <br />