Laserfiche WebLink
However, copy the OTS PIO at pio@ots.ca.gov and your OTS coordinator when any material is <br />distributed to the media and public, such as a press release, educational material, or link to social <br />media post. The OTS-supplied kick-off press release templates and any kickoff press releases <br />are an exception to this policy and require prior approval before distribution to the media and <br />public. <br />• If an OTS-supplied template, educational material, social media graphic, post or video is <br />substantially changed, the changes shall be sent to the OTS PIO at pio@ots.ca.gov for approval <br />and copy to your OTS Coordinator. Optimum lead time would be 7 days prior to the scheduled <br />release date, but at least 3 business days prior to the scheduled release date for review and <br />approval is appreciated. <br />• Press releases, social media posts and alerts on platforms such as NextDoor and Nixle reporting <br />immediate and time -sensitive grant activities (e.g. enforcement operations, day of event <br />highlights or announcements, event invites) are exempt from the OTS PIO approval process. The <br />OTS PIO and your Coordinator should still be notified when the grant -related activity is <br />happening (e.g. car seat checks, bicycle rodeos, community presentations, DUI checkpoints, <br />etc.). <br />• Enforcement activities such as warrant and probation sweeps, court stings, etc. that are <br />embargoed or could impact operations by publicizing in advance are exempt from the PIO <br />approval process. However, announcements and results of activities should still be copied to the <br />OTS PIO at pio@ots.ca.gov and your Coordinator with embargoed date and time or with <br />"INTERNAL ONLY: DO NOT RELEASE" message in subject line of email. <br />• Any earned or paid media campaigns for TV, radio, digital or social media that are part of a <br />specific grant objective, using OTS grant funds, or designed and developed using contractual <br />services by a subgrantee, requires prior approval. Please send to the OTS PIO at <br />pio@ots.ca.gov for approval and copy your grant coordinator at least 3 business days prior to the <br />scheduled release date. <br />• Social media posts highlighting state or national traffic safety campaigns (Distracted Driving <br />Month, Motorcycle Safety Awareness Month, etc.), enforcement operations (DUI checkpoints, <br />etc.), or any other grant -related activity such as Bicycle rodeos, presentations, or events, are <br />highly encouraged but do not require prior approval. <br />• Submit a draft or rough -cut of all digital, printed, recorded or video material (brochures, posters, <br />scripts, artwork, trailer graphics, digital graphics, social posts connected to an earned or paid <br />media campaign grant objective) to the OTS PIO at pio@ots.ca.gov and copy your OTS <br />Coordinator for approval prior to the production or duplication. <br />• Use the following standard language in all press, media, and printed materials, space permitting: <br />Funding for this program was provided by a grant from the California Office of Traffic Safety, <br />through the National Highway Traffic Safety Administration. <br />• Space permitting, include the OTS logo on all grant -funded print materials, graphics and paid or <br />earned social media campaign grant objective; consult your OTS Coordinator for specifics, <br />format -appropriate logos, or if space does not permit the use of the OTS logo. <br />• Email the OTS PIO at pio@ots.ca.gov and copy your OTS Coordinator at least 21 days in <br />advance, or when first confirmed, a short description of any significant grant -related traffic safety <br />event or program, particularly events that are highly publicized beforehand with anticipated media <br />coverage so OTS has sufficient notice to arrange for attendance and/or participation in the event. <br />If unable to attend, email the OTS PIO and coordinator brief highlights and/or results, including <br />any media coverage (broadcast, digital, print) of event within 7 days following significant grant - <br />related event or program. Media and program highlights are to be reflected in QPRs. <br />• Any press releases, work plans, scripts, storyboards, artwork, graphics, videos or any <br />educational or informational materials that received PIO approval in a prior grant year needs to <br />be resubmitted for approval in the current grant year. <br />• Contact the OTS PIO or your OTS Coordinator for consultation when changes from any of the <br />above requirements might be warranted. <br />Task 1 - Pedestrian and Bicycle Safety Education Workshops and Classes to help support <br />increased knowledge and understanding of pedestrian and bicycle safety in Santa Ana: <br />• Collect Bicycle Helmet Usage Surveys. A pre -survey to determine the base year helmet use rate, <br />and a post -survey required to determine the operational rate. <br />10/20/2023 11:54:06 AM Page 5 of 17 <br />