Award Construction Contract to Elecnor Belco Electric, Inc. <br />December 19, 2023 <br />Page 2 <br />lighting in an under lit area providing a safer and welcoming environment for <br />pedestrians and motorists. Once the street lighting improvements are completed, it will <br />increase traffic safety for pedestrians and all road users. Scope of work includes the <br />installation of new street light poles including the foundations, luminaire arm, Light <br />Emitting Diode (LED) luminaire, wiring, and electrical meter pedestal in the French Park <br />Neighborhood and on Willits Street from Fairview Street to Nottingham Avenue (Exhibit <br />1). <br />Public Outreach and Contractor Particiaation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of 52 <br />regional vendors via PlanetBids, many of which are Santa Ana based. A total of four <br />bids were received. No bids were received from any Santa Ana contractors. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on September 21 and 28, 2023. The project was also advertised in <br />PlanetBids from September 20 through October 12, 2023. Bids were received <br />electronically via PlanetBids on October 12, 2023. No bid protest was submitted by any <br />of the bidders during the bid protest period. <br />Bid Results Summary <br />Rank <br />Bidder's Name <br />Location <br />Base Bid <br />1 <br />Elecnor Belco Electric, Inc. <br />Chino, CA <br />$ 676,386 <br />2 <br />Comet Electric, Inc. <br />Chatsworth, CA <br />$753,974 <br />3 <br />International Line Builders, <br />Corona, CA <br />$843,941 <br />Inc. <br />4 <br />PAR Western Line <br />Rancho <br />$1 487,119 <br />Contractors <br />Cucamonga, CA <br />A total of four bids were received and all were deemed responsive. Elecnor Belco <br />Electric, Inc. submitted the lowest responsive base bid in the amount of $676,386 <br />(Exhibit 2). As specified in the bid documents, the lowest bid shall be determined on the <br />basis of the Base Bid. Based on the bid analysis and a contractor's reference check, <br />staff recommends awarding the construction contract to Elecnor Belco Electric, Inc. <br />(Exhibit 3). <br />Elecnor Belco Electric, Inc. has previously performed work as a prime contractor in the <br />City of Santa Ana within the last five years most recently completing Main Street at 15t" <br />Street Traffic Signal Installation. A reference check was made with staff and good <br />reviews were received regarding the quality of work performed by the contractor on <br />previous projects. <br />