My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Pedestrian and Mobility Improvements Phase II
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Item 20 - Pedestrian and Mobility Improvements Phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 1:50:08 PM
Creation date
12/14/2023 3:32:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A ADDENDUM NO. 1 <br />CITY OF SANTA ANA PROJECT 22-1406 <br />PROPOSAL <br />PROJECT NO.: 22-1406 <br />PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE II — ARPA I CSLFRF <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Elecnor Beleo Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Pedestrian Hybrid Beacon <br />I <br />LS <br />$ <br />$ <br />Installation at Flower St and 3rd Stg�ola{� <br />Z3gq' <br />$ <br />2 <br />Pedestrian Hybrid Beacon <br />I <br />LS <br />$ <br />Installation at Susan St and 5th St <br />Zk% 0O0 <br />2%.5,Oeo <br />3 <br />Traffic Signal Installation at <br />l <br />LS <br />$ <br />$ <br />Fairview St and Highland St <br />3pZ'S4'5 <br />3oZ,S`�5 <br />4 <br />Install Video Detection System at <br />I <br />EA <br />$ <br />$ <br />Flower St and 3rd St <br />Z1,,G5LA <br />7-t,G5'-i <br />$ <br />5 <br />Install Video Detection System at <br />1 <br />EA <br />$ <br />Susan St and 5th St <br />Z1,654 <br />Zt16511 <br />6 <br />Install Video Detection System at <br />1 <br />EA <br />$ <br />$ <br />Fairview St and Highland St <br />3'l,9t% <br />7 <br />Install APS System at Flower St <br />1 <br />LS <br />$ <br />$ <br />and 3rd St <br />1a,300o <br />t't'3d$ <br />K <br />Install APS System at Susan St and <br />I <br />LS <br />$ <br />$ <br />5th St <br />10j9'1B <br />lO,a-18 <br />9 <br />Install APS System at Fairview St <br />I <br />LS <br />$ <br />$ <br />and Highland St <br />2-0,032- <br />2-0,03z <br />10 <br />Install GTT Opticom EVP System <br />l <br />LS <br />$ <br />$ <br />at Fairview St & Highland St <br />(Z,y2Z <br />1Z,�IZZ <br />t I <br />Install 3" PVC Conduit per Plan <br />1560 <br />LF <br />$ is <br />$1l l'mo <br />12 <br />Install 4" PVC Conduit per Plan <br />1500 <br />LF <br />$ 85 <br />$12-1,500 <br />13 <br />Install No. 5 Pull Box <br />4 <br />EA <br />$ BW <br />$ 3,5Zo <br />14 <br />Install No. 6 Pull Box <br />20 <br />EA <br />$ qzo <br />$ (% 400 <br />15 <br />Install No. 6E Pull Box <br />8 <br />EA <br />$ 1, l Zs <br />$ 1,0W <br />16 <br />Install CCTV and IP <br />I <br />LS <br />$ <br />$ <br />Communication Systems at <br />Z H �653 <br />2y,653 <br />Fairview St and Highland St <br />P-1 of P-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.