My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Pedestrian and Mobility Improvements Phase II
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Item 20 - Pedestrian and Mobility Improvements Phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 1:50:08 PM
Creation date
12/14/2023 3:32:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 1 <br />CITY OF SANTA ANA PROJECT 22-1406 <br />PROPOSAL <br />PROJECT NO.: 22-1406 <br />PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE II — ARPA I CSLFRF <br />Item Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />17 Install 1P Communication System at <br />I <br />LS <br />$ <br />$ <br />Flower St and 3rd St <br />18 Install I Communication System at <br />I <br />LS <br />$ <br />$ <br />Susan St and 5th St <br />19 Pothole Utilities not shown on <br />5 <br />EA <br />$ <br />Plans <br />8L(—j <br />L{,Z3S <br />20 Install 12 Strand SMFO Cable <br />550 <br />LF <br />$ <br />21 Install 144 Strand SMFO Cable <br />1370 <br />LF <br />$ <br />22 Install Fusion Splice Strand of <br />48 <br />EA <br />$ <br />$ <br />SMFO <br />S$ <br />Z 78H <br />23 InstalI Fiber Optic Splice Enclosure <br />3 <br />EA <br />$ <br />5 <br />I,S18 <br />4ISS4 <br />24 Signing and Striping <br />I <br />LS <br />$0.8►545 <br />S ku'sg5 <br />25 Pothole Pole Locations for Utilitv <br />22 <br />EA <br />$ <br />$ <br />Conflicts <br />26 Remove and Construct PCC <br />350 <br />SF <br />$ <br />$ <br />Median Nose (including Steel <br />Rebar Dowels) at Fairview St and <br />tifo <br />I�,loo <br />Highland St* <br />27 Unclassified Excavation * <br />770 <br />CY <br />$ <br />28 Construct 8" PCC with (3-day) <br />Cure, Including Dowels * <br />3 <br />CY <br />$ <br />ZSG'( <br />$ S {� <br />^]/ <br />29 Crushed Miscellaneous Base <br />50 <br />TN <br />$ <br />$ <br />(CMB) * <br />63 <br />k50 <br />30 PCC Side,.%alk (T 4")* <br />3,660 <br />SF <br />$ Is <br />$ S4'g00 <br />31 PCC Curb Ramp * <br />2,380 <br />SF <br />$ Lj6 <br />$mL80 <br />32 PCC Curb and Gutter (Type A-2- <br />230 <br />LF <br />$ <br />$ <br />6)* <br />,7-W <br />33 C Curb and Gutter (Type A-2- <br />550 <br />LF <br />$ <br />$6q <br />8 <br />1� <br />300 <br />34 Colored Concrete — Brick Red <br />2,270 <br />SF <br />$ <br />$ <br />(Topcast Exposed Aggregate <br />(83 ,C(Q0 <br />Finish) (T 4")* <br />35 Metal Bollards <br />4 <br />EA <br />$ 2,7-7(o <br />$ 01,10t( <br />36 Topsoil Backfill (as -needed) * <br />25 <br />CY <br />$ (� <br />$ %S15 <br />37 Concrete Entry Monument <br />I <br />LS <br />$ <br />$ <br />(Including 2 Water Proof Light <br />9/405 <br />L(cl,t(05 <br />Fixtures) <br />38 Adjust PLIIIbox to Finished Grade <br />2 <br />EA <br />$ <br />oq <br />P-2 of P-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.