My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Pedestrian and Mobility Improvements Phase II
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Item 20 - Pedestrian and Mobility Improvements Phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 1:50:08 PM
Creation date
12/14/2023 3:32:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 1 <br />CITY OF SANTA ANA PROJECT 22-1406 <br />PROPOSAL <br />PROJECT NO.: 22-1406 <br />PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE 1I — ARPA I CSLFRF <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />17 <br />Install 1P Communication System at <br />I <br />LS <br />$ <br />$ <br />Flower St and 3rd St <br />is'-511 <br />t%-6-11 <br />18 <br />Install I Communication System at <br />Susan St 5th St <br />I <br />LS <br />$ <br />$ <br />and <br />19 <br />Pothole Utilities not shown on <br />5 <br />EA <br />$ <br />$ <br />Plans <br />84-1 <br />4,7-35 <br />20 <br />Install 12 Strand SMFO Cable <br />550 <br />LF <br />$ <br />$ <br />21 <br />Install 144 Strand SMFO Cable <br />1370 <br />LF <br />$ Ltctv <br />$(0.71,3 <br />22 <br />Install Fusion Splice Strand of <br />48 <br />EA <br />$ S`8 <br />$ 2 78K <br />SMFO <br />i <br />23 <br />Install Fiber Optic Splice Enclosure <br />3 <br />EA <br />$ <br />$ <br />I,518 <br />4,554 <br />24 <br />Signing and Striping <br />l <br />LS <br />$ q <br />IZ8,5 5 <br />$ t7�,Sg5 <br />25 <br />Pothole Pole Locations for Utility <br />22 <br />EA <br />$ <br />$ <br />Conflicts <br />Will <br />l$16'34 <br />26 <br />Remove and Construct PCC <br />350 <br />SF <br />$ <br />$ <br />Median Nose (including Steel <br />Rebar Dowels) at Fairview St and <br />Hi hland St* <br />27 <br />Unclassified Excavation * <br />770 <br />CY <br />$ <br />$ Q vicl0 <br />28 <br />Construct 8" PCC with (:-day) <br />Cure, Including Dowels * <br />3 <br />CY <br />$ <br />Z50`�I <br />$ (Z <br />^]/S <br />29 <br />Crushed Miscellaneous Base <br />* <br />50 <br />TN <br />$ <br />$ <br />S/k50 <br />(CMB) <br />30 <br />PCC Sidewalk (T 4")* <br />3,660 <br />SF <br />$ <br />31 <br />PCC Curb Ramp * <br />2,380 <br />SF <br />$ Lj6 <br />32 <br />PCC Curb and Gutter (Type A-2- <br />230 <br />LF <br />$ <br />I l4 <br />$ <br />ZG,ZW <br />6)* <br />33 <br />PCC Curb and Gutter (Type A-2- <br />B* <br />550 <br />LF <br />$ 1� <br />$ <br />6q � <br />) <br />'� <br />34 <br />Colored Concrete — Brick Red <br />2,270 <br />SF <br />$ <br />$ <br />(Topcast Exposed Aggregate <br />1 <br />(83 ,cta0 <br />Finish) (T 4")* <br />35 <br />Metal Bollards <br />4 <br />EA <br />$ 2,27(o <br />$%jotj <br />36 <br />Topsoil Backfill (as -needed) * <br />25 <br />CY <br />$ (p� .-a, <br />$ %S15 <br />37 <br />Concrete Entry Monument <br />I <br />LS <br />$ <br />q <br />$ <br />L(gIk05 <br />(Including 2 Water Proof Light <br />9/405 <br />Fixtures) <br />38 <br />Adjust PUIlbox to Finished Grade <br />2 <br />EA <br />$ <br />$ <br />1,30q <br />z,(a(� <br />P-2 of P-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.