My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Pedestrian and Mobility Improvements Phase II
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
12/19/2023 Regular
>
Item 20 - Pedestrian and Mobility Improvements Phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 1:50:08 PM
Creation date
12/14/2023 3:32:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 1 <br />CITY OF SANTA ANA iiPROJECT 22-1406 <br />PROPOSAL <br />PROJECT NO.: 22-1406 <br />PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE II — ARPA I CSLFRF <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />39 <br />AC Pavement* <br />395 <br />TN <br />$ ZS3 <br />$ <br />$ <br />q9,a35 <br />40 <br />PCC Curb and Gutter (Type B-1)* <br />45 <br />LF <br />$ <br />41 <br />PCC Modified Curb (Traffic Circle)* <br />80 <br />LF <br />$ <br />$ <br />$ <br />42 <br />Colored Concrete Including Rebar - <br />160 <br />SF <br />$ <br />Brick Red (Topcast Exposed Aggregate <br />_7Q <br />z00 <br />Finish) (T=10")* <br />$ <br />43 <br />Adjust Manhole Frame and Cover to <br />i <br />EA <br />$ <br />Finished Grade <br />2 (cQ1 <br />44 <br />Adjust Water Valve Frame and Cover <br />2 <br />EA <br />$ <br />$ <br />to Finished Grade <br />Z,OLC( <br />r Chi$ <br />45 <br />Install 2" PVC Conduit per Plan <br />630 <br />LF <br />$ <br />46 <br />Install Truncated Domes <br />4 <br />EA <br />$ <br />$-7ZQ)L1 <br />SZI <br />$ <br />$ <br />47 <br />Landscape <br />I <br />LS <br />S617-$0 <br />'SO ,Z$O <br />48 <br />Furnish and Install Water Meter Frame <br />I <br />EA <br />$ <br />$ <br />?-"aLI5 <br />and Cover <br />21SKS <br />49 <br />Relocate Pull Box and Adjust to <br />i <br />EA <br />$ <br />$ <br />Finished Grade <br />tIZ30 <br />(,-?--So <br />50 <br />Install No. 6T (Traffic Rated) Pull Box <br />2 <br />EA <br />$ <br />� 5 <br />$ <br />S,�So <br />51 <br />Install SCE Pull Box <br />2 <br />EA <br />$ a$O <br />$ -IGO <br />I, <br />52 <br />As -Built Plans <br />I <br />LS <br />$5,000 <br />$5,CW <br />53 <br />Project Advertising Signs <br />2 <br />EA <br />$ VISO <br />$_S' SGO <br />54 <br />Construction Permits <br />I <br />LS <br />$8,500 <br />$ 8 Sc� <br />r <br />55 <br />Bioretention Basin (including <br />250 <br />SF <br />$ <br />$ <br />Excavation, Export, Grading, <br />Bioretention Media, Gravel, Pea Gravel, <br />ZLto <br />(0010co <br />Impervious Liner, and Landscaping) <br />56 <br />Curb Cut Inlet (Including Cobblestone <br />Energy Dissipater) <br />1 <br />EA <br />$ (()r6G8 <br />$ <br />57 <br />Curb Cut Outlet <br />i <br />EA <br />$ -le Z`i <br />$ <br />-7 SZ4 <br />58 <br />18" Thick Curb & Gutter per <br />50 <br />LF <br />$ <br />«3 <br />$ Q (os� <br />Bioretention Detail <br />P-3 of P-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.