Laserfiche WebLink
GOVERNMENT CONSULTING PARTNERS <br />GCP <br />1) Santa Ana PW Indirect Cost Rate Proposal <br />PROJECT SCOPE: Develop a PW ICRP that meets Caltrans guidelines for the following PW departments: <br />• Construction Engineering new AU 01117611 <br />• CIP Engineering (aka Design Engineering) remains in AU 08617613 <br />This ICRP will be based on: <br />• 2022/2023 actual expenditures. <br />• Follow federal and state (Caltrans) guidelines and format, i.e. <br />agency: City of Santa Ana <br />Department Public Works Fund 86 <br />riscal year: 2o22/2o22 Actual Expenditures <br />Or <br />Allowable <br />Allowable <br />sc <br />Total Costs <br />Excluded <br />Indirect <br />Direct <br />A) Personnel con.. <br />15a l a ry and Wages <br />$ 2,776,998 <br />$ 711,925 <br />$ 2,065,063 <br />DkMbuflon%, <br />100% <br />0% <br />25.64% <br />24.36% <br />2 Tempore ry&Overtime <br />$ 75,768 <br />$ 75,768 <br />3 Benefits so 58% <br />$ 1,682,250 <br />$ 431,271 <br />$ 1350,929 <br />subtotal <br />$ 4,535,006 <br />$ 75,768 <br />$ 1,143,196 <br />$ 3316.042 <br />81 <br />[Other Operating Expenses <br />4 <br />Accident Repair & Replacement <br />31018.00 <br />3,018.00 <br />- <br />5 <br />Benefits Overhead <br />9,858.00 <br />9,858 <br />6 <br />Building Rental <br />110,743.50 <br />110,743.50 <br />- <br />Communications <br />28,936.12 <br />28,936 <br />8 <br />Contract Services -Professional <br />201,739.14 <br />201,739 <br />9 <br />Delivery Charges <br />2,287.84 <br />2,287.84 <br />- <br />10 <br />Gas &Diesel <br />17,030.00 <br />17,030.00 <br />- <br />11 <br />Insurance Charges <br />494,967.00 <br />494,967.00 <br />- <br />121T <br />Maintenance Charge <br />162,745.34 <br />162,745.34 <br />- <br />13 <br />Maintenance& Repair Machinery&Equil <br />158.51 <br />159 <br />14 <br />Membership, Subscription&Ones <br />4,000.08 <br />3,000.00 <br />1,000 <br />15 <br />Miscellaneous Operating Expenses <br />50,495.75 <br />50,496 <br />16 <br />Public Works Administrative Charges <br />6 'IC;3.32 <br />644,833.32 <br />- <br />17 <br />Rental City Equipment <br />40,132.00 <br />4 ,132.00 <br />- <br />1s <br />Trill ni ng, Transportati on, Meeting <br />6,6T1.64 <br />6,678 <br />19 <br />20 <br />Subtotal: <br />5 1,717622 <br />5 1A78757 <br />5 298,865 <br />$ <br />TotaIDept Ex erdnures <br />$ 6.312,628 <br />q 1$54525 <br />$ 1,442,062 <br />5 3316,042 <br />GlComt,lService Co. Allocation <br />21 Ci Wwi de 2 CFR 200 CAP <br />259,295 <br />259,295 <br />22 PW Advan mntl lot oeptwitle 3 cm 1. cPP <br />470,837 <br />470,837 <br />23 <br />24 <br />- <br />25 <br />- <br />Tota l Cos is of a l l Divi slons: <br />$ 7,042,760 <br />$ 1,554,525 <br />$ 2,372,194 <br />$ 3,316,042 <br />DI Indirect Rate: <br />Dept I ndi rest Costs: <br />$2.172.19a <br />Dlrect5alaries <br />52,065,063 <br />Indhect cost Rate: <br />vo53% <br />PURPOSE: Calculate the indirect cost rate that will be submitted to Caltrans for reimbursement of city engineering costs <br />related to state Caltrans funded projects. <br />CONSULTING FEE: $27,000 (fixed fee, includes all expenses) <br />1 <br />