Laserfiche WebLink
e <br />CITY OF SANTA ANA <br />advance to avoid shortages or "out of stock" scenarios. <br />E. Renovation Process <br />Shall have the CR, unless approved otherwise, during the rennovation process: <br />1. Day 1 <br />2. Day 2 <br />3. Day 3 <br />4. Day 4 <br />a. Irrigation audit, ensure coverage and adjust sprinklers heads to 1/2:" below <br />grade. <br />b. Aeration (the Kubota L5060 tractor equipped with turf -type tires AerWay <br />aeration equipment utilizing the Toro Pro Core 648 (or Equal)) <br />a. Scalping and vertical cutting. <br />b. Following verticutting all turf clippings shall be removed. <br />a. Apply seed and drag -in to level surface, coordinate with CR to verify seed type <br />and quanitites <br />b. Immediately after over -seeding and topping, the Contractor shall drag the turf <br />pushing the seed underneath the existing turf. <br />c. Apply light topper dresser (apply W minus STA-approved compost topper <br />from R&S Soils) <br />a. Coordinate with CR for the watering program <br />5. Day 5 - Completion <br />a. Inspect daily and monitor germination. In the last two (2) weeks of the <br />rennovation period, the mowing shall be done in intervals. <br />RFP 23-151 Landscape Maintenance Services Page 40 of 135 <br />