My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - City of Santa Ana 2023 General Plan Annual Progress Report_20240313225459475
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
03/19/2024
>
Item 13 - City of Santa Ana 2023 General Plan Annual Progress Report_20240313225459475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 4:22:27 PM
Creation date
3/13/2024 3:57:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
13
Date
3/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-77 <br /> <br />ELEMENT REF # EJ IMPLEMENTATION ACTION AGENCY TIME <br />FRAME 2023 UPDATE <br />Public <br />Services <br />3.9 No Emergency water. Coordinate with <br />neighboring water utilities to continue <br />multiple emergency interconnection <br />practices and maintain mutual aid <br />program participation. <br />PWA Ongoing Continued to Coordinate with <br />neighboring water utilities to continue <br />multiple emergency interconnection <br />practices and maintain mutual aid <br />program participation. <br />Public <br />Services <br />3.10 No Water-efficient programs. Continue to <br />collaborate with regional water agencies <br />to promote and provide resources and <br />rebates for the installation of water- <br />efficient fixtures and landscapes. <br />PWA Ongoing Continued to collaborate with regional <br />water agencies to promote and provide <br />resources and rebates for the <br />installation of water-efficient fixtures <br />and landscapes. <br />Public <br />Services <br />3.11 No Service rates. Continue to perform <br />periodic (approximately every five years) <br />cost of service studies and recommend <br />prudent affordable water and sewer <br />rates. <br />PWA Ongoing Continued to evaluate cost of service <br />and rates to retain prudent affordable <br />water and sewer rates. <br />Public <br />Services <br />3.12 No Infrastructure funding. Continue to <br />pursue grant funding and low-cost loans <br />for improving and upgrading the water <br />and sewer systems. <br />PWA Ongoing In 2023, the City was awarded $1.25 <br />million of competitive statewide grant <br />funding from the California Natural <br />Resources Agency for a flood reduction <br />and stormdrain upgrade project from <br />the California Natural Resources <br />Agency.
The URL can be used to link to this page
Your browser does not support the video tag.