Laserfiche WebLink
A-94 <br /> <br />ELEMENT REF # EJ IMPLEMENTATION ACTION AGENCY TIME <br />FRAME 2023 UPDATE <br />Urban <br />Design <br />7.2 No Gateway impact fee. Consider amending <br />the zoning code to require projects <br />within proximity of a defined city <br />gateway to incorporate gateway design <br />features. If the development project is <br />unable to integrate such features on- <br />site, an in-lieu fee may be paid into a <br />gateway fund. <br />PBA/PWA 2022 The RFP for the Comprehensive Zoning <br />Code Update was released and <br />proposals were due to the City on April <br />13, 2023. The City formally entered an <br />agreement with a consultant on <br />October 17, 2023 to start the Zoning <br />Code Update. The project will include <br />considering amending the zoning code <br />to require projects within proximity of a <br />defined city gateway to incorporate <br />gateway design features. If the <br />development project is unable to <br />integrate such features on-site, an in- <br />lieu fee may be paid into a gateway <br />fund. <br />