My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Agreement with Houston & Harris, PCS, Inc. to Provide Closed Circuit Television
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/02/2024
>
Item 13 - Agreement with Houston & Harris, PCS, Inc. to Provide Closed Circuit Television
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 9:03:33 AM
Creation date
3/27/2024 8:17:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
13
Date
4/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 24-003 <br />CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SANITARY SEWERS <br />through the infraMAP® software, will designate the locations that are to be inspected. <br />Use of the infraMAP® software by the Contractor is required. The City shall train the <br />Contractor in the use of infraMAP® as it relates to the documentation of sewer cleaning <br />and inspection activities. <br />8. If the Contractor encounters conditions in the field that do not correspond to those <br />indicated on the maps, the Contractor shall promptly inform the City of the discrepancy. <br />If manholes or terminating cleanouts are encountered that are not shown on the maps, <br />the Contractor shall use the next available manhole number as shown on the maps for <br />the video assessment and indicate the location where the manhole was found. The City <br />will incorporate those changes into the maps. The use of non-standard or incorrectly <br />numbered manholes by the Contractor in either the database or on the video overlay as <br />shown on the digital video is cause for rejection of both the digital video and the <br />database in which it is referenced and any costs associated with re-videoing of the main, <br />modifications to the video overlay or rectification of the database that are necessitated <br />by the consultant's failure to use designated naming conventions will be borne entirely <br />by the Contractor. <br />9. At all points within the sewer showing defects, laterals and sewer appurtenances, the <br />consultant shall stop the camera, rotate (up to 360 degrees) and/or tilt the camera lens <br />to ensure adequate video coverage. All defects shall be rated/scored and logged in <br />accordance with NASSCO guidelines. <br />10. The camera shall be stopped and/or backed up to view and analyze conditions that <br />appear unusual or uncommon to a sewer main in good condition. There shall be no <br />loss of video quality at any time. <br />11. As the video is produced, the technician shall provide an audio narration of the <br />inspection to include identification of the sewer main location, by street intersection <br />location or street address as well as by City manhole number, inspection direction <br />(upstream/downstream) and complete descriptions of the line conditions as they are <br />encountered. The audio portion of the video recording shall be free from electrical <br />interference, feedback, hum, and background noise. <br />12. If the camera cannot pass the entire sewer reach from its point of insertion, the reach <br />shall be inspected from both directions. The inspection logs for the reach shall include <br />an identification of the nature and location of the blockage. The Contractor shall notify <br />the City immediately of any such obstruction so that it may be repaired or mitigated by <br />the City and/or the Contractor so that work may proceed. <br />13. Video runs showing condensation or submersion of the lens, poor or out -of -focus <br />images, poor audio, or otherwise poor image quality shall be cause for rejection and <br />may necessitate re -inspecting at the Contractor's expense if the City determines the <br />video run is not of acceptable quality. <br />14. In special cases, when directed by the City, the Contractor shall be responsible for <br />plugging manhole outlets during CCTV inspection. The sewer lines will be in service at <br />City of Santa Ana RFP 24-003 <br />Closed Circuit Television (CCTV) Inspection of Sanitary Sewers <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.