EXHIBIT 1 <br />Page 2 of 6 <br /> <br />allocation of $250,000 to $500,000 to install ramps in a meaningful <br />strategic area. <br />Various Traffic Calming <br />Measures <br /> Round-about for Memory and Flower – the City has received <br />grant for a new Memory Lane Bikeway Project that will change <br />the intersection geometry and prohibit the ability to install a <br />round-about. <br /> Candlestick delineators – a budget of $50,000 would be <br />necessary to replace them in the identified locations. The <br />enhanced versions would cost approximately $100,000. <br /> Repainting of striping and pavement markers – this is ongoing <br />maintenance work and redone approximately every 3 years. <br />An additional $200,000 is needed help expedite the <br />completion of the repainting cycle and help get us down to a <br />2-year cycle. <br /> Center Medians – depending on location and size, these may <br />range from $250,000 to $500,000 each. <br /> Traffic Mitigation in Mabury Park – Staff has evaluated and <br />found that mitigation is unwarranted at this time. <br /> Stop Sign at a specific location – Staff will conduct a stop sign <br />warrant and traffic signal warrant. If warranted, $750,000 <br />would be needed to fund a pedestrian hybrid beacon or traffic <br />signal. <br /> Speed humps on English and Alona – Staff evaluated and <br />determined they are not warranted. Other locations are <br />currently being evaluated. Funding is available for qualifying <br />speed hump locations. <br />Sidewalk Repairs  The budget includes an annual funding allocation of $1 million <br />for sidewalk repairs. The City’s needs warrant doubling the <br />budget. <br /> Sidewalk repairs in the Park Santiago neighborhood were <br />recently completed that addressed the major concerns. This <br />neighborhood is not scheduled for sidewalk repairs for a few <br />years. An allocation of $75,000 to $100,000 could address <br />additional sidewalks in the neighborhood. <br /> Bolivar Circle is in City of Garden Grove. Properties on the <br />west side of Fairview in this segment are not in the City of <br />Santa Ana. <br />Pedestrian Bridge <br />Improvements <br />An RFP to assess the condition of the bridge between W River Lane <br />and W Riviera will be released in next month. The assessment/design <br />costs are expected to approximate $100,000 and construction costs <br />are to be determined. <br />Solar-Powered Lighting <br />Under Overpass <br />The Santiago St Bridge in currently in the queue to address. <br />Neighborhood Lights The Cost of neighborhood street light projects vary by scope but we <br />can assume about $750,000 per neighborhood. <br />Faded Neighborhood Street <br />Signs <br />Sign replacement is part of ongoing maintenance. City Council can <br />identify specific locations.