My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/02/2024
>
Agenda Packet_2024-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 9:21:08 AM
Creation date
3/27/2024 9:20:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/2/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cooperative Agreement No. 2024-1 <br />1 between La Habra Boulevard and I-405 SB Ramps, and geographically located in LA HABRA, <br />2 FULLERTON, ANAHEIM, GARDEN GROVE, SANTA ANA, and FOUNTAIN VALLEY; the inclusion <br />3 of the offset signals will minimize the impacts of the signal synchronization of the PROJECT corridor signals <br />4 on said offset signals; and <br />5 WHEREAS,the PROJECT Scope of Work includes the procurement, construction, installation and <br />6 modification of existing traffic signal controllers and cabinets, foundation, countdown-type signal heads, <br />7 video detection systems, traffic surveillance cameras, emergency vehicle preemption, power supplies, pull <br />8 boxes, signal interconnect communication upgrades including but not limited to fiber optic cables, signal <br />9 performance measures, and central system upgrades at the respective PARTIES’ Traffic Management <br />10 Centers;and <br />11 WHEREAS,the PROJECT Scope of Work also includes development, implementation, and <br />12 fine-tuning of coordination signal timing plans for various peak periods, and the ongoing monitoring and <br />13 maintenance of the coordinated signal system’s operation, including signal timing coordination and system <br />14 communication/detection upkeep, for a period of no less than two years; and <br />15 WHEREAS, LA HABRA agrees to work with AGENCIES to coordinate the inclusion of other <br />16 traffic control elementsthat must be installed at the same time as the construction of the PROJECT that are <br />17 NOT a part of the PROJECT Scope of Work and that arethe responsibility of each respective PARTY during <br />18 the course of the PROJECT; and <br />19 WHEREAS,the PARTIESacknowledge that other RTSSP corridor projects are currently underway <br />20 or completed which intersect the PROJECT, and that these other RTSSP corridor timing operations must be <br />21 incorporated into the design and completion of this PROJECT; and <br />22 WHEREAS, this AGREEMENT defines the roles, specific terms, conditions and responsibilities <br />23 between the PARTIES. <br />24 AGREEMENT <br />25 NOW THEREFORE, it is understood and agreed by the PARTIES as follows: <br />26 ARTICLE 1. COMPLETE AGREEMENT <br />27 This AGREEMENT constitutes the complete and exclusive statement of the terms and conditions of <br />Page 3 of 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.