My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/02/2024
>
Agenda Packet_2024-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 9:21:08 AM
Creation date
3/27/2024 9:20:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/2/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cooperative Agreement No. 2024-1 <br />1 the agreement between the PARTIES concerning the PROJECT and supersedes all prior representations, <br />2 understandings, and communications between the PARTIES. The above-referenced Recitals are true and <br />3 correct and are incorporated by reference herein. <br />4 ARTICLE 2. RESPONSIBILITIES OF LA HABRA <br />5 LA HABRA agrees to the following responsibilities: <br />6 1. LA HABRA shall serve as lead agency for design, construction, and construction management of <br />7 the PROJECT and shall provide oversight by establishing PROJECT milestones and overseeing the <br />8 PROJECT development to ensure compliance with all standards and requirements set forth in this <br />9 AGREEMENT. <br />10 2. LA HABRA shall be responsible for completing the PROJECT in accordance with the funding <br />11 guidelines and any and all other federal, state,and OCTA requirements related to these funding programs, <br />12 as well as any and all applicable statutes and regulations including, but not limited to, biddinglaws, prevailing <br />13 wage and other labor laws, provisions of the California Building Standards Code, and the California <br />14 Environmental Quality Act (CEQA) and the Guidelines thereunder. <br />15 3. LA HABRA shall be responsible for providing the required documentation and funding <br />16 commitments for project implementation on the CALTRANS portions of the PROJECT within LA <br />17 HABRA’S geographical jurisdictions. <br />18 4. LA HABRA shall provide AGENCIES a copy of all design documents for AGENCIES’ approval <br />19 of work to be performed in AGENCIES’ jurisdictions prior to LA HABRA advertising for bids. <br />20 5. LA HABRA shall enter into a separate Cooperative Agreement with the STATE for the <br />21 implementation of the STATE components of the PROJECT. <br />22 6. LA HABRA shall be responsible for obtaining all required permits for project implementation <br />23 from the STATE for the STATE components of the PROJECT. <br />24 7. LA HABRA shall provide staff, consultants, and contractors deemed necessary and appropriate to <br />25 manage, administer, coordinate,and oversee engineering design and construction management of the <br />26 PROJECT. LA HABRA shall require all suchconsultants, including architects and civil engineers,and <br />27 contractorsto obtain and maintain comprehensive general liability, automobile liability, workers’ <br />Page 4 of 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.