My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/02/2024
>
Agenda Packet_2024-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 9:21:08 AM
Creation date
3/27/2024 9:20:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/2/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cooperative Agreement No. 2024-1 <br />1 compensation and employers’ liability, and professional liability insurance policies meeting the applicable <br />2 requirements of the Consultant Contract and Bidders Specifications for the PROJECT and toindemnify, <br />3 defend, and hold each of the AGENCIES and their respective elected officials, officers, employees, agents <br />4 and volunteers (“Indemnitees”) free and harmless, including payment of attorneys’ and experts’ fees, with <br />5 respect to any and all claims and liabilitiesof any kind arising out of each such consultant’s and/or <br />6 contractor’s acts or omissions in the performance of work on the PROJECT, to the maximum extent <br />7 permitted by law. LA HABRA shall require all such contractors to name the Indemnitees as additional <br />8 insureds on all commercial general and automobile liability policies required by LA HABRA for the <br />9 PROJECT. <br />10 8. The budget for the PROJECT is Six Million, Two Hundred One Thousand, Two Hundred and <br />11 Sixty-SixDollars ($6,201,266). Four Million, Nine Hundred Sixty-OneThousand, and Thirteen Dollars <br />12 ($4,961,013) is funded by OCTA through RTSSP (Project P). Minimum PROJECT matching funds of <br />13 twentypercent (20%) amount to One Million, TwoHundred Forty Thousand, Two Hundred and Fifty-Three <br />14 Dollars ($1,240,253). LA HABRA’s portion of the PROJECT cost is approximately Six Hundred Seventeen <br />15 Thousand Three Hundred and Seven Dollars ($617,307) with a corresponding 20% local agency matchup <br />16 to One Hundred Twenty-Three Thousand, Four Hundred and Sixty-One Dollars ($123,461) including in- <br />17 kind services. Documentation of LA HABRA’S in-kind services, such as administrative services, design <br />18 and construction-related services including equipment procurement and inspection, and City-furnished <br />19 PROJECT equipment, shall meet OCTA Comprehensive Transportation Funding Program (CTFP) <br />20 Guidelines. <br />21 9. LA HABRA shall maintain coordination with AGENCIES for construction of the PROJECT. <br />22 10. LA HABRA specifically shall coordinate construction activity for the PROJECT within <br />23 AGENCIES and provide a schedule of the construction activityfor the PROJECT within AGENCIES that is <br />24 acceptable to AGENCIES. In the event of planned street closures, LA HABRA shall provide prior notice to, <br />25 and receive approval from, the responsible AGENCY, prior to the execution of the street closure. <br />26 11. LA HABRA shall require AGENCIES and its officers and employees to be named as additional <br />27 insured on the construction contractors’ liability insurance policies. <br />Page 5 of 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.