|
Cooperative Agreement No. 2024-1
<br />1 Comprehensive Transportation Funding Programs. Individual AGENCIES’ PROJECT cost allocations and
<br />2 the corresponding local agency matches per OCTA’s approved grant are summarized below.
<br />3
<br />Euclid Street Corridor Project Cost Summary
<br />Project CostLocal Agency In-Kind Match (@ 20%)
<br />Agency
<br />PIO&MPIO&M
<br />LaHabra$584,307.42$33,000.00$116,861.48$6,600.00
<br />Fullerton$1,496,555.76$64,800.00$299,311.15$12,960.00
<br />Anaheim$1,070,747.72$80,400.00$214,149.54$16,080.00
<br />Garden Grove$1,369,482.92$62,400.00$273,896.58$12,480.00
<br />Santa Ana$543,334.10$25,800.00$108,666.82$5,160.00
<br />Fountain Valley$814,038.09$56,400.00$162,807.62$11,280.00
<br />Subtotal:$5,878,466.00$322,800.00$1,175,693.20$64,560.00
<br />Total:$6,201,266.00$1,240,253.20
<br />4
<br />5 a. FULLERTON’s portion of the PROJECT cost is approximately One Million, Five Hundred
<br />6 Sixty-One Thousand, Three Hundred and Fifty-Six Dollars ($1,561,356) with a corresponding
<br />7 20% local agency match of up to Three Hundred Twelve Thousand, Two Hundred and Seventy-
<br />8 One Dollars ($ 312,271) including in-kind services.
<br />9 b. ANAHEIM’s portion of the PROJECT cost is approximately One Million, One Hundred Fifty-
<br />10 One Thousand, One Hundred and Forty-Eight Dollars ($1,151,148) with a corresponding 20%
<br />11 local agency match of up to Two Hundred Thirty Thousand, Two Hundred and Thirty Dollars
<br />12 ($230,230) including in-kind services.
<br />13 c. GARDEN GROVE’s portion of the PROJECT cost is approximately One Million, Four
<br />14 Hundred Thirty-One Thousand, Eight Hundred and Eighty-Three Dollars ($1,431,883) with a
<br />15 corresponding 20% local agency match of up to Two Hundred Eighty-Six Thousand, Three
<br />16 Hundred and Seventy-Seven Dollars ($286,377) including in-kind services.
<br />17 d. SANTA ANA’s portion of the PROJECT cost is approximately Five Hundred Sixty-Nine
<br />18 Thousand, One Hundred and Thirty-Four Dollars (569,134) with a corresponding 20% local
<br />Page 7 of 18
<br />
<br />
<br />
|