My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/02/2024
>
Agenda Packet_2024-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 9:21:08 AM
Creation date
3/27/2024 9:20:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/2/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cooperative Agreement No. 2024-1 <br />1 work done in ANAHEIM’s jurisdiction. <br />2 10. At no cost to LA HABRA, SANTA ANA’s Construction Inspectors shall oversee all construction <br />3 work done in SANTA ANA’sjurisdiction. <br />4 11. At no cost to LA HABRA, GARDEN GROVE’s Construction Inspectors shall oversee all <br />5 construction work done in GARDEN GROVE’s jurisdiction. <br />6 12. At no cost to LA HABRA, FOUNTAIN VALLEY’s Construction Inspectors shall oversee all <br />7 construction work done in FOUNTAIN VALLEY’s jurisdiction. <br />8 13. At no cost to LA HABRA, AGENCY shall be responsible for coordinating the construction and/or <br />9 installation of traffic control elements and other items within AGENCIES’ jurisdiction that are NOT a part <br />10 of the PROJECT Scope of Work but, by necessity, must be built concurrent with the PROJECT. <br />11 14. In the event of an unanticipated cost overrun, LA HABRA shall meet with AGENCIES to <br />12 resolve the cost overrun. Should the PARTIES be unable to come to a resolution of the cost overrun, the <br />13 AGREEMENT will terminate. <br />14 ARTICLE 4. MUTUAL RESPONSIBILITIES OF THE PARTIES <br />15 The PARTIES agree to the following mutual responsibilities: <br />16 1. The PARTIES are responsible for the review, implementationand maintenance of the timing for <br />17 the corridor offset intersections as defined in the RECITALS. <br />18 2. The PARTIES shall cooperate and coordinate their staff, contractors and consultants, in providing <br />19 the services and responsibilities required under this AGREEMENT to the extent practicable with respect to <br />20 the performance of the PROJECT. <br />21 3. The PARTIES agree to work together in good faith, using reasonable efforts to resolve any <br />22 unforeseen issues and disputes arising out of the performance of this AGREEMENT. <br />23 4. The PARTIES shall be responsible for obtaining the required additional STATE permits for <br />24 additional STATE requested improvements that are NOT a part of the PROJECT Scope of Work on the <br />25 STATE portions of PROJECT within their respective geographic jurisdictions. <br />26 5. This AGREEMENT may only be modified or amended upon written agreement of all PARTIES. <br />27 All modifications, amendments, changes and revisions of this AGREEMENT in whole or in part, and from <br />Page 9 of 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.