My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON & HARRIS, PCS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HOUSTON & HARRIS, PCS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 10:50:28 AM
Creation date
5/3/2024 10:49:15 AM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON & HARRIS, PCS, INC.
Contract #
A-2024-039
Agency
Public Works
Council Approval Date
4/2/2024
Expiration Date
4/2/2024
Insurance Exp Date
4/1/2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding Scope of Services <br />Understanding Scope of Services Overview: As outlined in Attachment 1 of the RFP, Houston & Harris, <br />PCS, Inc. is prepared to deliver on all aspects of needs associated with the approximately 400 miles of <br />sewer mains, two sewer lift stations, 48,500 sewer laterals, and 8,500 sewer manholes that are used to <br />convey all sewer from the City to the Orange County Sanitation District system and ensure the city is in <br />compliance with the State's waste discharge requirements of maintaining the sanitary system in good <br />repair. <br />Sewer Cleaning: We acknowledge and accept the specified conditions outlined for the cleaning and <br />CCTV inspection of sewers as part of the project scope. Our team is committed to ensuring that all sewers <br />are cleaned thoroughly within 24 hours prior to conducting CCTV inspections, except when otherwise <br />directed by the Engineer. Our cleaning process will comprehensively remove grease, roots, debris, and <br />other obstructions to facilitate seamless CCTV inspection. We understand that all costs associated with <br />the cleaning of sewers and sewer manholes, including water usage and fees related to obtaining and <br />securing a hydrant water meter from the City, shall be our responsibility. We will adhere to the <br />requirement of returning the water hydrant meter to the City every six months. Our team is equipped with <br />a variety of nozzles and cutter heads, including high -velocity water jets and root cutters, to address the <br />specific cleaning needs of each sewer section. We are committed to employing cleaning methods that <br />will ensure the pipe is sufficiently clear to allow the camera to pass through and accurately document the <br />structural and operational condition of the pipe. Should any CCTV inspection work be necessitated due <br />to our failure to adequately clean the main, we understand that the associated costs will be borne entirely <br />by our company. We will utilize a tablet PC with internet access to connect to the infraMAP® software, <br />as provided by the City, to record the location of the cleaning operation and the conditions encountered <br />for each cleaned section of sewer main. Our team will undergo training provided by the City to ensure <br />proficient use of the infraMAP® software. Upon completion of designated work areas, digital video, logs, <br />and other materials will be delivered as required. We understand that the City will use the <br />comprehensiveness of the cleaning reports and the cleanliness of the pipe, as evidenced by the supplied <br />video, to evaluate whether the pipe was cleaned sufficiently. We are aware that any costs related to re- <br />cleaning an unreported or insufficiently cleaned main will be our responsibility. <br />Sewer Main Television Inspection: We confirm our capability to conduct all CCTV inspections using <br />WinCan VX Expert software for pipe survey reporting, ensuring detailed and standardized documentation <br />of the sewer conditions. Our equipment is specifically designed for sewer inspection and adheres to the <br />requirements outlined. We utilize cameras with optimal illumination and rotational abilities to maintain <br />focus on the sewer's periphery, ensuring comprehensive inspection regardless of pipe diameter. We <br />City of Santa Ana RFP 24-003 <br />Closed Circuit Television (CCTV) Inspection of Sanitary Sewers <br />� <br />P.O. Box 10367 �IV OIL �/ San Bernardino, CA 92423 <br />"AR Z 909-422-8990 5a <br />ii� CA#884167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.