My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON & HARRIS, PCS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HOUSTON & HARRIS, PCS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 10:50:28 AM
Creation date
5/3/2024 10:49:15 AM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON & HARRIS, PCS, INC.
Contract #
A-2024-039
Agency
Public Works
Council Approval Date
4/2/2024
Expiration Date
4/2/2024
Insurance Exp Date
4/1/2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding Scope of Services <br />employ advanced cable footage counters for precise measurement documentation, displayed and <br />recorded as per specifications. Our system integrates all required data overlays, including date, time, <br />location, flow direction, and pipe size, ensuring legibility and accuracy in reporting. Each inspection will <br />commence with a view of the open manhole, proceeding downstream unless otherwise directed or <br />approved by the City. We are committed to uninterrupted recording in compliance with the project <br />specifications. Houston & Harris, PCS, Inc. has 14 technicians with NASSCO certification, and all <br />technicians assigned to the City of Santa Ana will have over two years of experience. We will provide the <br />City with their qualifications and sample videos for approval before project commencement, ensuring <br />compliance with the City's standards. During inspections, our technicians will provide detailed audio <br />records and computerized assessments, identifying all relevant features and conditions within the sewer <br />system, adhering to the comprehensive logging requirements. We will fully engage with the infraMAP® <br />software for access to the City's sewer system maps and data, ensuring precise location tracking and <br />documentation. Our team will undergo City -provided training for proficient use of infraMAP®. Should field <br />conditions deviate from provided maps or undocumented manholes are discovered, we will promptly <br />report these discrepancies to the City for resolution and map updates, adhering strictly to the designated <br />naming conventions. In line with NASSCO guidelines, our camera operations will thoroughly document <br />and rate all defects, ensuring complete rotational and tilt coverage for a detailed assessment of the sewer <br />conditions. Our inspection protocol includes stopping and analyzing unusual or uncommon conditions, <br />maintaining high video quality throughout the inspection process. The audio narration accompanying our <br />video inspections will be clear, free from interference, and include comprehensive descriptions of line <br />conditions and sewer main locations, enhancing the understanding of the sewer system's state. In cases <br />where the camera cannot pass through a sewer reach, we will inspect from both directions and <br />immediately notify the City of any obstructions for prompt resolution, ensuring the continuity of the <br />inspection process. We understand the importance of high -quality video runs and will ensure that all <br />footage is free from condensation, submersion, or any quality impairments, ready to re -inspect at our <br />expense if deemed necessary by the City. When required by the City, we will manage sewer flows by <br />plugging manhole outlets to facilitate effective CCTV inspections, ensuring the sewer lines remain in <br />service without disruption. We are prepared to conduct inspections during low -flow periods, including <br />nighttime hours between 10 p.m. and 5 a.m., to accommodate high -volume flows without additional cost <br />adjustments. Upon notification from the City, we will commence the specified CCTV inspections within <br />five (5) working days, diligently pursuing completion to meet the project timelines and requirements. <br />City of Santa Ana RFP 24-003 <br />Closed Circuit Television (CCTV) Inspection of Sanitary Sewers <br />�•`/ f P.O. Box 10367 <br />YV �N San Bernardino, CA 92423 <br />909-422-8990 <br />CA 9884167 <br />5b <br />
The URL can be used to link to this page
Your browser does not support the video tag.