My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROFESSIONAL ACCESS CCTV & ELECTRICAL, INC. (PROPRIETARY ACCESS CONTROL ENTERPRISES, INC.)
Clerk
>
Contracts / Agreements
>
P
>
PROFESSIONAL ACCESS CCTV & ELECTRICAL, INC. (PROPRIETARY ACCESS CONTROL ENTERPRISES, INC.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 11:55:39 AM
Creation date
5/3/2024 11:27:13 AM
Metadata
Fields
Template:
Contracts
Company Name
PROFESSIONAL ACCESS CCTV & ELECTRICAL, INC. (PROPRIETARY ACCESS CONTROL ENTERPRISES, INC.)
Contract #
N-2024-151
Agency
Library
Expiration Date
12/31/2026
Insurance Exp Date
6/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal 8304RD-03152024 COSA Main Library Access Sys PM March 19, 2024 <br />SCOPE <br />PACE has been requested to provide a value to the city of Santa Ana to help provide clarity as to the <br />installation of the AMAG Access Control system and all its associated elements. PACE will be acting as a <br />consulting and management component to the project to ensure that the system is installed as per the cities <br />direction and the system operates as intended to provide security and accountability to the accessibility of <br />the library. As part of this proposal paste will outline the information to be provided to the perspective bidders <br />to.ensure that all values presented for the systems installation we'll meet the expectations of the desired <br />operation and to ensure the products use will meet their intended compatibility with the main AMAG system. <br />Project Details: <br />As part of this proposal PACE is prepared to provide the following services and management of the city of <br />Santa Ana's New Hope libraries installation of the access control system and associated components such <br />as locking hardware and other automated controls within the scope of the access control systems capability. <br />PACE has reviewed the drawings provided for the remodeling of the library. PACE is noting that at this time <br />a full specification document has not been created or was not provided for review at this time. PACE will <br />provide the needed information for the Division 28 Information for the Access Control Portion of the system <br />as well as a concise list of the access control components that will be used for the project. <br />PACE will work with the architect to provide the needed Material Data sheets for all needed Access control <br />components as well as 'Best Practices' installation details for the access control equipment to meet the COSA <br />standards all ready in play at the City hall. This can be provided in the form of drawings for the incorporation <br />in to the Architects drawings for the security system component, PACE had noted that the drawings would <br />need some equipment information changes to match the C.O.S.A.'s equipment types in use so the credentials <br />can be shard between all city facilities. <br />PACE will do the same for the Division 8 Section for the provision of the electrified hardware and will work <br />with the architect to provide a concise list of the door hardware for the "Electrified Hardware" that will be <br />controlled by the AMAG Access control System. This will be provided in the form of a Hardware schedule for <br />those doors by door number as well. PACE will ensure to work with the architect to ensure the specifications <br />of the operational element is met, but also the desired aesthetics of the hardware to match the overall design <br />of the Library. <br />Management and Project Oversight. <br />As part of PACE's role, it has reviewed these sections and will as part of this proposal, provide a concise list <br />of materials associated with the installation of the access control system to ensure that all materials have <br />been clearly identified as to their model numbers and specifics. This will be provided to the Architect for <br />incorporation in to the Division 8 and 28 Sections. <br />This will ensure that prospective bidders are providing exactly what the city of Santa Ana needs as well as <br />removing speculation and interpretation of some of the verbiage of these two sections. Below will be a list of <br />elements and guidance that PACE will provide as part of this value to ensure that the city of Santa Ana has <br />these specific system and components installed that match there recently installed system at City Hall as well <br />as the intent of the operation. <br />Below is the Information that PACE will be providing: <br />• PACE will provide Constructability review of the project plans to ensure the equipment ids <br />compatible the proposed infrastructure <br />• Specific part numbers and model numbers of the AMAG equipment that will match the city of Santa <br />Anas existing equipment deployment within the City Hall. <br />• Specific part numbers and model numbers of the card readers that are to be used at each door and <br />location we're an access control point is to be located. <br />• Specific part numbers and model numbers of the power supplies that are utilized to power the door <br />locks which are predominantly low voltage which will centralized the Power Distribution to these <br />devices. <br />Page # 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.