Laserfiche WebLink
Proposal 8304RD-03152024 COSA Main Library Access Sys PM March 19, 2024 <br />• Specific part numbers and model numbers of any auxiliary devices that will be needed to supplement <br />the operation of the access control doors such as door position sensors and request to exit devices. <br />• Specific part numbers and model type of the access control cable needed for the connection of the <br />field devices to the access control system. <br />• Specific wiring formats for the access control doors in the field and at the access control panel. <br />Door Hardware <br />• PACE will assist the architect in creating the concise hardware schedule for the Electrified Portion of <br />the project. This require the collaboration in the type of hardware Style that is being reviewed for <br />acceptance and reviewing the electrification options with that manufacture or operations. This will <br />hopefully take into consideration the choices that will also accommodate the creation of the list and <br />style with the needed for electrification and operation and in any preparations for the accommodations <br />of electrification and security. <br />• PACE will create and provide a concise hardware schedule for the electrified doors to be incorporated <br />into the door hardware schedule for the prospective bidders by the Architect. <br />Additional Physical services to be included. <br />• PACE will attend one meeting a week during the project projects duration to ensure that the city of <br />Santa ana's expectations are being met on the project. <br />• PACE will make themselves available to the vendor of choice for the projects installation for the <br />answering their questions and installation assistance in the form of direction or just information <br />providing <br />• PACE will provide any assistance of device terminations in the form of direction if needed. <br />• PACE will provide the needed programming to enable all the integrator's installation and verify and <br />test with the integrator to ensure the system is meeting expectations in its operation. <br />• PACE can help give guidance to the integrator of choice in the event the system needs adjustments <br />in the field and to also ensure that the installation of the product is meeting the city of Santa Ana's <br />expectations of operation. <br />• Any trouble shooting of the operation of the system that cannot be resolved through remote <br />communications and will require a site visit, will incur a cost for the time expended for the resolution <br />at PACE's normal service rates and are not included in the cost provided. <br />• PACE can review the final documentation ensure that it meets expectations in regards to the as -build <br />documentation as well The equipment documentation that is needed for closeout. <br />As part of this proposed value PACE will not be providing any physical labor towards the installation, but will <br />be providing they needed oversight, guidance and final programming of this system to ensure the equipment <br />is installed properly and operates as intended. PACE will ensure the new elements of the Library's New <br />System will be integrated in to the City's Current AMAG platform with full compatibility an <br />functionality. <br />EXCLUSIONS: <br />• This proposal is to ensure that the system components and equipment that will be provided to the <br />city of Santa Ana are clearly identified for each potential bidder. When that potential bidder is chosen <br />the city of Santa Ana will know that they are providing and exactly what is being described as needed <br />within the proposal for the desired operations. <br />• PACE is not providing any equipment and is merely a management entity for the project. The city of <br />Santa Ana will ultimately choose and award the contract to their bidder of choice knowing that they <br />are providing these specific equipment needed for the operation. <br />• PACE is not responsible if the integrator of choice does not follow the directives of the city of Santa <br />Ana in regards to specific model types and equipment that are designated for the project. <br />• PACE will be providing some limited project management of the installation, but does not have full <br />control over the integrator except to provide them guidance as to the desired outcome. PACE will <br />provide information to the city of Santa Ana for the guidance to ensure the systems is installed <br />Page # 3 <br />