Laserfiche WebLink
Proposal 8304DS-03152024 COSA Newhope Library Access Sys PM March 15, 2024 <br />• Any trouble shooting of the operation of the system that cannot be resolved through remote <br />communications and will require a site visit will incur a cost for the time expended for the resolution <br />at PACE's normal service rates and are not included in the cost provided. <br />• PACE can review the final documentation ensure that it meets expectations in regards to the as -build <br />documentation as well The equipment documentation that is needed for closeout. <br />That as part of this proposed value pace will not be providing any physical labor towards the installation, but <br />will be providing they needed oversight, guidance and final programming of this system to ensure the <br />equipment is installed property and operates as intended. <br />EXCLUSIONS: <br />• This proposal is to ensure that the system components and equipment that will be provided to the <br />city of Santa Ana are clearly identified for each potential bidder. When that potential bidder is chosen <br />the city of Santa Ana will know that they are providing exactly what is being described as needed <br />within the proposal for the desired operations. Peace is not providing any equipment and is merely a <br />management entity for the project. The city of Santa Ana we're ultimately choose an award the <br />contract to their bidder of choice knowing that they are providing these specific equipment needed <br />for the operation. <br />• PACE is not responsible if the integrator of choice does not follow the directives of the city of Santa <br />Ana in regards to specific model types and equipment that are designated for the project. <br />• PACE will be providing some limited project management of the installation, but does not have full <br />control over the integrator except to provide them guidance as to the desired outcome. PACE will <br />provide information to the city of Santa Ana for the guidance to ensure the systems is installed <br />properly and is meeting expectations. The city of Santa ana is ultimately responsible for the direction <br />to the integrator of choice. <br />TERMS and CONDITIONS: <br />The following Terms and Conditions are part of PACE Proposal 8304DSRD-03152024 Newhope Library New <br />ACS, <br />TERMS OF ACCEPTANCE <br />This document will remain Valid for a period of Thirty (30) days from the date of proposal. <br />Acceptance following this period will be subject to review and pricing updates. <br />SALES AGREEMENT <br />PACE Sales Agreement is hereby included as a part of this proposal. <br />DEPOSIT <br />PACE requests a deposit of 35% of Installation Price upon issuance of P.O. Number or contract. This will be <br />required of any project or proposal exceeding $2,000.00 unless otherwise agreed upon. <br />PROGRESS PAYMENTS <br />Customer to be billed for materials ordered for this specific project or projects. The materials may be stored <br />under controlled conditions at our warehouse for your review, until ready for deployment to the field. Labor <br />will be billed on an as -used basis or in accordance with agreed upon progress. <br />Page # 3 <br />