Laserfiche WebLink
Cooperative Agreement No.2024-1 <br /> 1 by GARDEN GROVE; and <br /> 2 WHEREAS,Euclid Street between Emperor Quang Trung/Oakfield Avenue and McFadden Avenue <br /> 3 is maintained by SANTA ANA; and <br /> 4 WHEREAS, Euclid Street between Edinger Avenue and I-405 SB Ramps is maintained by <br /> 5 FOUNTAIN VALLEY; and <br /> 6 WHEREAS, the intersections of Euclid Street at Imperial Highway, Euclid Street at the SR-91 <br /> 7 I Interchange(EB and WB ramps), Euclid Street at I-5 (NB and SB ramps) Interchange, Euclid Street at SR- <br /> 8 22 Interchange (EB and WB ramps), and Euclid Street at I-405 (NB and SB ramps) Interchange are <br /> 9 maintained by the State of California, hereinafter referred to as"STATE" or"CALTRANS", and a separate <br /> 10 Cooperative Agreement is entered into between LA HABRA and CALTRANS for the STATE-maintained <br /> 11 traffic signals; and <br /> 12 WHEREAS,the Measure M2 Regional Traffic Signal Synchronization Program,hereinafter referred <br /> 13 to as "RTSSP", targets over 2,000 signalized intersections across Orange County to maintain traffic signal <br /> 14 synchronization, improve traffic flow, and reduce congestion across jurisdictions; and <br /> 15 WHEREAS, LA HABRA and AGENCIES are committed to implementing multi jurisdictional <br /> 16 signal synchronization to enhance countywide traffic flow, and reducing congestion; and <br /> 17 WHEREAS, the Orange County Transportation Authority, hereinafter referred to as "OCTA", <br /> 18 approved funding for the Euclid Street Corridor RTSSP Project, hereinafter referred to as"PROJECT"; and <br /> 191 WHEREAS, the PARTIES will provide matching funds as required by the Orange County <br /> 20 Comprehensive Transportation Funding Programs; and <br /> 21 WHEREAS,LA HABRA.agrees to act as the lead agency for design,construction,and management <br /> 22 of the PROJECT; and <br /> 23 WHEREAS, the PROJECT will include sixty-seven (67) signalized intersections along the Euclid <br /> 24 Street Corridor between La Habra Boulevard and I-405 SB Ramps, and geographically located in LA <br /> 25 HABRA, FULLERTON, ANAHEIM, GARDEN GROVE, SANTA ANA, and FOUNTAIN VALLEY; and <br /> 26 WHEREAS, the PROJECT will include sixty-nine (69) offset signalized intersections, defined as <br /> 27 signalized intersections situated within 2700 feet along the side streets of the PROJECT corridor signals <br /> Page 2 of 18 <br />