My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY OF LA HABRA
Clerk
>
Contracts / Agreements
>
C
>
CITY OF LA HABRA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 10:07:26 AM
Creation date
5/3/2024 1:49:08 PM
Metadata
Fields
Template:
Contracts
Company Name
CITY OF LA HABRA
Contract #
A-2024-038
Agency
Public Works
Council Approval Date
4/2/2024
Expiration Date
12/31/2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cooperative Agreement No.2024-1 <br /> 1 <br /> 1 between La Habra Boulevard and I-405 SB Ramps, and geographically located in LA HABRA, <br /> 2 FULLERTON, ANAHEIM, GARDEN GROVE, SANTA ANA, and FOUNTAIN VALLEY; the inclusion <br /> 3 of the offset signals will minimize the impacts of the signal synchronization of the PROJECT corridor signals <br /> 4 on said offset signals; and <br /> 5 WHEREAS, the PROJECT Scope of Work includes the procurement, construction, installation and <br /> 6 modification of existing traffic signal controllers and cabinets, foundation, countdown-type signal heads, <br /> 7 video detection systems, traffic surveillance cameras, emergency vehicle preemption, power supplies, pull <br /> 8 boxes, signal interconnect communication upgrades including but not limited to fiber optic cables, signal <br /> 9 performance measures, and central system upgrades at the respective PARTIES' Traffic Management <br /> 10 Centers; and <br /> 11 WHEREAS, the PROJECT Scope of Work also includes development, implementation, and <br /> 12 fine-tuning of coordination signal timing plans for various peak periods, and the ongoing monitoring and <br /> 13 maintenance of the coordinated signal system's operation, including signal timing coordination and system <br /> 14 communication/detection upkeep, for a period of no less than two years; and <br /> 151 WHEREAS, LA HABRA agrees to work with AGENCIES to coordinate the inclusion of other <br /> 16 traffic control elements that must be installed at the same time as the construction of the PROJECT that are <br /> 17 NOT a part of the PROJECT Scope of Work and that are the responsibility of each respective PARTY during <br /> 18 the course of the PROJECT; and <br /> 19 WHEREAS,the PARTIES acknowledge that other RTSSP corridor projects are currently underway <br /> 20 or completed which intersect the PROJECT, and that these other RTSSP corridor timing operations must be <br /> 21 incorporated into the design and completion of this PROJECT; and <br /> 22 WHEREAS, this AGREEMENT defines the roles, specific terms, conditions and responsibilities <br /> 23 between the PARTIES. <br /> 24 AGREEMENT <br /> 25 NOW THEREFORE, it is understood and agreed by the PARTIES as follows: <br /> 26 ARTICLE 1. COMPLETE AGREEMENT <br /> 27 This AGREEMENT constitutes the complete and exclusive statement of the terms and conditions of <br /> Page 3 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.