My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:08:53 PM
Creation date
5/16/2024 11:29:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
10
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roberts <br />INCORPORATED <br />11nn ntnn=at (4n..('P. <br />T.E. Roberts, Inc. <br />17771 Mitchell Forth <br />Irvine, CA 92614 <br />Phone (714) 669-0072 Fax (714) 200-0241 <br />TO: <br />Edward A. Torres - Senior Engineer <br />Public Works Agency I OP Delivery Engineering <br />20 Civic Center Plaza, M-36 I Santa Ana, CA 92702 <br />(Office) 714-647-5018 <br />(Mobile) 714-719-0013 <br />ATTNV Mike / Emin/ E. Torres <br />Proposal <br />DATE:7/26/2023 <br />FOR: Items to complete work and MWD Requests <br />DESCRIPTION <br />Unit <br />Qty <br />Total <br />(Estimate) <br />Engineered Shoring Plans for Options <br />1 <br />LS <br />$7,290.00 <br />Submission & Additional MWD requests & Shoring <br />Requirements <br />1 <br />LS <br />$6,500.00 <br />Additional 45 Degree Bends A & B <br />1 <br />LS <br />$8,174.60 <br />Additional Fabrication Per MWD Change <br />1 <br />LS <br />$9,320.00 <br />Abandon Previously Installed Pipeline <br />1 <br />LS <br />$5,500.00 <br />Remove & Dispose of Conflicting Concrete <br />1 <br />LS <br />$31,239.00 <br />Remove & Dispose of Conflict Vault <br />1 <br />LS <br />$12,500.00 <br />Line -item Adjustments to accommodate balance of <br />work <br />BI#1 Mobilization <br />1 <br />LS <br />$15,000.00 <br />BI#21 Traffic Control <br />1 <br />LS <br />$3,600.00 <br />BI#27 Dewatering <br />1 <br />LS <br />$4,000,00 <br />Credit for BI# Construct 4" Bottom Drain Blow -off Assembly <br />1 <br />LS <br />($22,300.00) <br />TOTAL <br />$80,823.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.