Laserfiche WebLink
ITEM 1.1 WORK STOPPAGE TO ACCOMMODATE MWD REQUIRED CHANGES <br />T 0) <br />Roberts <br />1HrnuanRvrFn <br />Change Order Basis: <br />Santa Ana Request : T.E. Roberts had to hold installation of vault piping connections due to unforeseen conditions at vault connection <br />location. Crew (at the City's direction) shifted focus on discovery for information to provide to Metropolitan water in order to propose <br />revised connections. T.E. Roberts (at the City's direction) pulled all shoring, backfilled, and demobilized from project site. Site was base <br />paved in order to secure while MWD option was selected. <br />12/08/2023 (Friday) Vault Work: $12,116.35 <br />12/13/2023 (Wednesday) Vault Work: $9,610.38 <br />12/14/2023 (Thursday) Vault Work: $22,039.47 <br />12/15/2023 (Friday) Demobilization: $3,747.97 <br />01/04/2024 (Thursday) SR-5 Vault: $3,092.19 <br />01/16/2024 (Tuesday) Demobilization: $5,166.65 <br />Cost Total <br />Item 1.1 Request $55,773.01 <br />(Supporting Documents Previously Provided to Santa Ana) <br />