My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 10 - Approve Additional Funds in the Amount of $270,000 for the SA-5 Vault Modifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:08:53 PM
Creation date
5/16/2024 11:29:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
10
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 1.1 WORK STOPPAGE TO ACCOMMODATE MWD REQUIRED CHANGES <br />RTE <br />oberts <br />INCORPORATED <br />,r rmiunni�naai�7i�ir61 <br />17771 Mitchell North <br />Irvine, CA 92614 <br />Phone (714) 669-0072 Fax (714) 200-0241 <br />To: City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, CA 92702 <br />Attn: Mike Ortiz/Emin Kayiiran, AKMCE <br />Change Order Request <br />No. 11 <br />Date: 01/29/2024 <br />SA-5 MWD Pipe Changes #2 <br />#5866 SA-5 Vault Modifications Project No. 11-641 <br />DESCRIPTION <br />QUANTITY <br />UOM <br />Unit $ <br />TOTAL <br />12/08/2023 (Friday) Vault Work - <br />Arrived on job site and set up traffic control <br />with a lane closure. Removed fence panels <br />around shield box. Removed top plate to <br />access shield. Used hydra -vac truck to <br />remove sludge and water in order to remove <br />blind screw plug. Re -checked diameter of <br />pipe, length, and O.D. of pipe stub out of <br />1 <br />LS <br />12,116.35 <br />12,116.35 <br />vault. Re -checked traffic control, sandbags, <br />signs, tarp and spoil piles. Took down lane <br />closure. Re -plated shield box and placed <br />fence around. Plugged pipe. Started demo <br />but was shut down due to possible <br />reengineering. Cleaned up and secured job <br />site. Took down the remaining traffic <br />control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.