Laserfiche WebLink
ITEM 1.2 REVISED MWD CONNECTION <br />Te� <br />Roberts <br />INCORPORATED <br />Santa Ana Request : Following submittal and approval of redesigned connection, TER ordered materials and will re -mobilize. Five working <br />days are proposed to complete the revised scope of work which includes: <br />Mobilization <br />Excavation &Shoring <br />Installation of Redesigned Piping <br />Additional Welding <br />Additional Confined Space Entry <br />Additional Ground Water Mitigation <br />Additional Traffic Control <br />Additional Restoration <br />See work sheet & WCP Quote <br />Estimated Cost Total <br />Item 1.2 Request $102,761.64 <br />Item 1.1 Request $55,773.01 <br />Item 1.2 Request $102,761.64 <br />Total $158,534.65 <br />