Laserfiche WebLink
ITEM 1.2A REVISED MWD CONNECTION <br />Roberts <br />INCORPORATED <br />17771 Mitchell North <br />Irvine, CA 92614 <br />DATE: <br />LOCATIC <br />DETAILS, <br />(Day TBD) - Estmated labor, equipment, and materall to: <br />Remobilize <br />Shore & Excavate <br />Install New Spool and make connection <br />COR <br /># <br />lobtt <br />Santa Ana - SA-5 Vault Modifications <br />5866 <br />Name on Paperwork <br />Days Ext: <br />TYPE <br />TOTAL(5) <br />RATEINR <br />CITY <br />REG AMT OT RATE QTY <br />OT AMT DT RATE CITY DT AMT <br />TOTAL <br />LABOR <br />FOREMAN/OPERATING ENG. <br />40.00 <br />139.22 <br />40.00 <br />5,568.8C <br />208.83 <br />- 278.44 - <br />5,568.8C <br />L4-PIPELAYER/Asphalt wkr <br />40.00 <br />107.11 <br />40.00 <br />4,284.4C <br />160.67 <br />- 214.22 - <br />4,284.4C <br />Ll-LABORER() <br />40.00 <br />105.80 <br />40.00 <br />4,232.00 <br />158.70 <br />- 211.60 - <br />4,232.00 <br />TRUCK DRIVER () <br />40.00 <br />106.22 <br />40.00 <br />4,248.8C <br />159.33 <br />- 212.44 - <br />4,248.8C <br />ECIPTOPERATOR() <br />40.00 <br />134.81 <br />40.00 <br />5,392.4C <br />202.22 <br />- 269.62 - <br />5,392.4C <br />L5-WELDER <br />16.00 <br />106.67 <br />16.00 <br />1,706.72 <br />160.01 <br />213.34 <br />1,706.72 <br />216.00 <br />216.00 <br />- <br />- - <br />LABOR TOTAL <br />$25,433.12 <br />EQUIPMENT <br />SERVICE TRUCK (1) <br />52.02 <br />40.00 <br />2,080.8C <br />2,080.8C <br />PICKUP TRUCK/VAN <br />43.51 <br />40.00 <br />1,740.4C <br />1,740.4C <br />ARROW BOARD(3) <br />17.50 <br />120.00 <br />2,100.00 <br />2,100.00 <br />FLATBED TRUCK <br />47.21 <br />8.00 <br />377.68 <br />377.68 <br />SACKHOE <br />86.98 <br />40.00 <br />3,479.2C <br />3,479.2C <br />LOADER <br />121.95 <br />40.00 <br />4,878.00 <br />4,878.00 <br />DUMP TRUCK, Bobtail <br />66.11 <br />40.00 <br />2,644.4C <br />2,644.4C <br />TRENCH SHIELD(2) <br />37.50 <br />80.00 <br />3,000.00 <br />3,000.00 <br />WELDING TRUCK <br />47.25 <br />16.00 <br />756.00 <br />756.00 <br />WATER TRUCK <br />67.14 <br />40.00 <br />2,685.6C <br />2,685.6C <br />CONFINEDSPACE EQPT <br />37.10 <br />16.00 <br />593.60 <br />593.60 <br />CRASH BARRELS(6) <br />11.25 <br />240.00 <br />2,700.00 <br />2,700.00 <br />K-RAIL (4) <br />7.56 <br />160.00 <br />1,209.6C <br />1,209.6C <br />DELINEATORS/ SIGNS (31) <br />0.35 <br />1,240.00 <br />434.00 <br />434.00 <br />TRAFFIC CONES (63) <br />0.35 <br />2,520.00 <br />882.00 <br />882.00 <br />VACTOR TRUCK <br />293.48 <br />20.00 <br />5,869.6C <br />5,869.6C <br />FENCE PANELS (10) <br />1.95 <br />400.00 <br />780.00 <br />780.00 <br />SKID STEER <br />48.32 <br />8.00 <br />386.56 <br />386.56 <br />ASPHALT ZIPPER <br />98.38 <br />8.00 <br />787.04 <br />787.04 <br />VIBRATORY ROLLER <br />35.59 <br />8.00 <br />284.72 <br />284.72 <br />PAVING MACHINE <br />243.29 <br />8.00 <br />1,946.32 <br />1,946.32 <br />EQPT TOTAL <br />$39,615.52 <br />5% <br />MATERIAL Sub Total Tax AMOUNT 15% <br />TOTAL <br />West Coast Vault Piping 27,460.00 2,402.75 29,862.75 4,479.41 <br />34,342.16 <br />MATERIAL TOTAL <br />$34,342.16 <br />SUBTOTAL 1 <br />$99,390.80 <br />1%- Bond <br />$993.91 <br />6% Fuel Charge <br />$2,376.93 <br />GRAND TOTAL 1 <br />$102,761.64 <br />®' <br />