ITEM 1.2A REVISED MWD CONNECTION
<br />Roberts
<br />INCORPORATED
<br />17771 Mitchell North
<br />Irvine, CA 92614
<br />DATE:
<br />LOCATIC
<br />DETAILS,
<br />(Day TBD) - Estmated labor, equipment, and materall to:
<br />Remobilize
<br />Shore & Excavate
<br />Install New Spool and make connection
<br />COR
<br />#
<br />lobtt
<br />Santa Ana - SA-5 Vault Modifications
<br />5866
<br />Name on Paperwork
<br />Days Ext:
<br />TYPE
<br />TOTAL(5)
<br />RATEINR
<br />CITY
<br />REG AMT OT RATE QTY
<br />OT AMT DT RATE CITY DT AMT
<br />TOTAL
<br />LABOR
<br />FOREMAN/OPERATING ENG.
<br />40.00
<br />139.22
<br />40.00
<br />5,568.8C
<br />208.83
<br />- 278.44 -
<br />5,568.8C
<br />L4-PIPELAYER/Asphalt wkr
<br />40.00
<br />107.11
<br />40.00
<br />4,284.4C
<br />160.67
<br />- 214.22 -
<br />4,284.4C
<br />Ll-LABORER()
<br />40.00
<br />105.80
<br />40.00
<br />4,232.00
<br />158.70
<br />- 211.60 -
<br />4,232.00
<br />TRUCK DRIVER ()
<br />40.00
<br />106.22
<br />40.00
<br />4,248.8C
<br />159.33
<br />- 212.44 -
<br />4,248.8C
<br />ECIPTOPERATOR()
<br />40.00
<br />134.81
<br />40.00
<br />5,392.4C
<br />202.22
<br />- 269.62 -
<br />5,392.4C
<br />L5-WELDER
<br />16.00
<br />106.67
<br />16.00
<br />1,706.72
<br />160.01
<br />213.34
<br />1,706.72
<br />216.00
<br />216.00
<br />-
<br />- -
<br />LABOR TOTAL
<br />$25,433.12
<br />EQUIPMENT
<br />SERVICE TRUCK (1)
<br />52.02
<br />40.00
<br />2,080.8C
<br />2,080.8C
<br />PICKUP TRUCK/VAN
<br />43.51
<br />40.00
<br />1,740.4C
<br />1,740.4C
<br />ARROW BOARD(3)
<br />17.50
<br />120.00
<br />2,100.00
<br />2,100.00
<br />FLATBED TRUCK
<br />47.21
<br />8.00
<br />377.68
<br />377.68
<br />SACKHOE
<br />86.98
<br />40.00
<br />3,479.2C
<br />3,479.2C
<br />LOADER
<br />121.95
<br />40.00
<br />4,878.00
<br />4,878.00
<br />DUMP TRUCK, Bobtail
<br />66.11
<br />40.00
<br />2,644.4C
<br />2,644.4C
<br />TRENCH SHIELD(2)
<br />37.50
<br />80.00
<br />3,000.00
<br />3,000.00
<br />WELDING TRUCK
<br />47.25
<br />16.00
<br />756.00
<br />756.00
<br />WATER TRUCK
<br />67.14
<br />40.00
<br />2,685.6C
<br />2,685.6C
<br />CONFINEDSPACE EQPT
<br />37.10
<br />16.00
<br />593.60
<br />593.60
<br />CRASH BARRELS(6)
<br />11.25
<br />240.00
<br />2,700.00
<br />2,700.00
<br />K-RAIL (4)
<br />7.56
<br />160.00
<br />1,209.6C
<br />1,209.6C
<br />DELINEATORS/ SIGNS (31)
<br />0.35
<br />1,240.00
<br />434.00
<br />434.00
<br />TRAFFIC CONES (63)
<br />0.35
<br />2,520.00
<br />882.00
<br />882.00
<br />VACTOR TRUCK
<br />293.48
<br />20.00
<br />5,869.6C
<br />5,869.6C
<br />FENCE PANELS (10)
<br />1.95
<br />400.00
<br />780.00
<br />780.00
<br />SKID STEER
<br />48.32
<br />8.00
<br />386.56
<br />386.56
<br />ASPHALT ZIPPER
<br />98.38
<br />8.00
<br />787.04
<br />787.04
<br />VIBRATORY ROLLER
<br />35.59
<br />8.00
<br />284.72
<br />284.72
<br />PAVING MACHINE
<br />243.29
<br />8.00
<br />1,946.32
<br />1,946.32
<br />EQPT TOTAL
<br />$39,615.52
<br />5%
<br />MATERIAL Sub Total Tax AMOUNT 15%
<br />TOTAL
<br />West Coast Vault Piping 27,460.00 2,402.75 29,862.75 4,479.41
<br />34,342.16
<br />MATERIAL TOTAL
<br />$34,342.16
<br />SUBTOTAL 1
<br />$99,390.80
<br />1%- Bond
<br />$993.91
<br />6% Fuel Charge
<br />$2,376.93
<br />GRAND TOTAL 1
<br />$102,761.64
<br />®'
<br />
|